TLC-2012
From Cues
Contents
Questions
- X Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?
- 10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.
- Heated Sonic Anemometer?
- Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.
- No action on this for 2012.
Notes
- 20120904.10:34 down clear radiometer swapped out.
New Stuff
- Solid state mux?
- Kerry to order and ship out this fall.
- Green LiDAR?
- Doubtful and the current LiDAR should be fine for another season as is.
- Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.
- Need to schedule installation and logistics.
- ?MASC needs? (Ned)
Replace/Rebuild/Reinstall/Recalibrate
- X radiometers: Done on 20120904.
- Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.
- ! Kerry will calibrate and send spares back to CUES this fall.
- ! Sutron: Email to vendor on 20120907 asking about calibration schedule.
- ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.
- LiDAR
- Doesn't need updating, stored in bunker, re-deploy before first storm.
- Soil moisture probe replacement.
- ! Kerry to ship calibrated probes to Alex.
- ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.
- Drains are 1.5"
- Do something to accommodate 3/4" chimney drain on South Wall.
- North Wall: 30"x30"x6"ish (2 drains at 2.5", 2 @ 2")
- South Wall: 30"wide x 24"tall x 6"ish deep. (all 4 drains @ 2")
- X Redo cable pulls w/ wire.
- West wall still needs loop built into end in bunker.
- X Recoil DTS cable.
- Took full photo inventory and sketched a map of layers and markers.
- ! Snow thermister deployment protocol.
- Alex or Ned will deploy Thermisters prior to significant storms.
- General painting and site cleanup.
- painted support posts on top of bunker, patched up bunker roof, started painting West side.
- X Reseal lysimeter w/ silocone.
- Also painted numbers on lysimeters.
- ! Begin design process for new lysimeters.
- Pondering hardy-backer, concrete, stone/tile
- New covers, may not be needed depending on new design, ponder tarps.
IT Tech Stuff:
- DONE: Netgear switch (mtc)
- Would be nice to have a 16-24 port silent gig switch.
- Inventory of items for calibration/overhaul.
- Replace Win VM? (mtc)
- Spare linksys wireless/firewall? (mtc)
- Bring one up this fall or whenever from UCSB.
- Network overhaul with VPN?
- No, not really needed.
- Fix the frigging PST/PDT issue on the Mac. (mtc)
Programming/scripting/processing
- (mtc) LiDAR error checking.
- (Dave+Adam/mtc) LiDAR auto processing.
- (Ned/mtc) Realtime MASC filter & display?
- X (mtc) reprogram data schlepping to put ".dat" at end of file names.