TLC-2012

From Cues
Jump to navigationJump to search

Post TLC FollowUp

Alex:

  • Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.
  • Need to schedule installation and logistics.
  • Bug MTC about site picture repository.
  • Deploy LiDAR pre snow.
  • Clean/clear lysimiters pre snow.
  • Install calibrated temp/RH sensor when Kerry ships it... remind Kerry.
  • Install replacement dome on camera when it arrives.
  • Check and recharge desiccant on radiometers.

Kerry:

  • Calibrate and ship spare Judd depth pingers.
  • Solid state mux?
  • Sutron: Email to vendor on 20120907 asking about calibration schedule.
  • Calibrate and ship spare soil moisture probes.
  • Calibrate and ship thermister strings.
  • Calibrate and ship temp/RH sensor.
  • Order replacement dome.

MTC:

  • Tipping bucket overhaul
  • Network: silent 16+port switch
  • Network: replace wireless
  • PST/PDT issue on Mac
  • Lidar error checking (alert when down).
  • Lidar auto processing?
  • Schedule Green LiDAR pre-snow capture from gun mount 1?
  • Ship DIMP to CRREL
  • Dump gamma sensors in EWaste
  • Dump fiber string in EWaste

Ned:

  • MASC
    • Relocate mini to tower next to MASC unit?
      • Headless w/ VNC/TeamViewer access.
      • Possible to run HDMI and USB to bunker for when direct access is needed.

Misc Notes

  • Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.
    • 10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.
  • Heated Sonic Anemometer?
    • Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.
  • 20120904.10:34 down clear radiometer swapped out.

Replace/Rebuild/Reinstall/Recalibrate

  • X radiometers: Done on 20120904.
  • Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.
  • LiDAR
    • Doesn't need updating, stored in bunker, re-deploy before first storm.
  • Soil moisture probe replacement.
    •  ! Kerry to ship calibrated probes to Alex.
  •  ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.
    • Drains are 1.5"
    • Do something to accommodate 3/4" chimney drain on South Wall.
    • North Wall: 30"x30"x6"ish (2 drains at 2.5", 2 @ 2")
    • South Wall: 30"wide x 24"tall x 6"ish deep. (all 4 drains @ 2")
  • X Redo cable pulls w/ wire.
    • West wall still needs loop built into end in bunker.
  • X Recoil DTS cable.
    • Took full photo inventory and sketched a map of layers and markers.
    • MTC schlepping to UCSB for techno trash.
    • Delivered coolers to Dozier's for eventual return to Reno.
  •  ! Snow thermister deployment protocol.
    • Alex or Ned will deploy Thermisters prior to significant storms.
  • General painting and site cleanup.
    • painted support posts on top of bunker, patched up bunker roof, started painting West side.
  • X Reseal lysimeter w/ silocone.
    • Also painted numbers on lysimeters.
    •  ! Begin design process for new lysimeters.
      • Pondering hardy-backer, concrete, stone/tile
    • New covers, may not be needed depending on new design, ponder tarps.

IT Tech Stuff:

  • DONE: Netgear switch (mtc)
    • Would be nice to have a 16-24 port silent gig switch.
  • Inventory of items for calibration/overhaul.
  • Replace Win VM? (mtc) No.
  • Spare linksys wireless/firewall? (mtc)
    • Bring one up this fall or whenever from UCSB.
  • Network overhaul with VPN?
    • No, not really needed.
  • Fix the frigging PST/PDT issue on the Mac. (mtc)

Programming/scripting/processing

  • (mtc) LiDAR error checking.
  • (Dave+Adam/mtc) LiDAR auto processing.
  • (Ned/mtc) Realtime MASC filter & display?
  • X (mtc) reprogram data schlepping to put ".dat" at end of file names.