Jump to navigationJump to searchLine 18: | Line 18: | ||
===Replace/Rebuild/Reinstall/Recalibrate=== | ===Replace/Rebuild/Reinstall/Recalibrate=== | ||
− | * radiometers | + | * X radiometers: Done on 20120904. |
− | * Depth pingers | + | * Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine. |
− | * Sutron | + | ** ! Kerry will calibrate and send spares back to CUES this fall. |
− | * Anemometers | + | * ! Sutron: Email to vendor on 20120907. |
+ | * ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES. | ||
* LiDAR | * LiDAR | ||
** Doesn't need updating, stored in bunker, re-deploy before first storm. | ** Doesn't need updating, stored in bunker, re-deploy before first storm. | ||
* Soil moisture probe replacement. | * Soil moisture probe replacement. | ||
− | ** Kerry to ship calibrated probes to Alex. | + | ** ! Kerry to ship calibrated probes to Alex. |
− | * Lysimeter tipping bucket overhaul: ideally put them side by side in a single row and down low, close to floor. | + | * ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor. |
**Drains are 1.5" | **Drains are 1.5" | ||
**Do something to accommodate 3/4" chimney drain on South Wall. | **Do something to accommodate 3/4" chimney drain on South Wall. | ||
**North Wall: 30"x30"x6"ish (2 drains at 2.5", 2 @ 2") | **North Wall: 30"x30"x6"ish (2 drains at 2.5", 2 @ 2") | ||
**South Wall: 30"wide x 24"tall x 6"ish deep. (all 4 drains @ 2") | **South Wall: 30"wide x 24"tall x 6"ish deep. (all 4 drains @ 2") | ||
− | * Redo cable pulls w/ wire. | + | * X Redo cable pulls w/ wire. |
− | * Recoil DTS cable. | + | ** West wall still needs loop built into end in bunker. |
− | ** Took full photo inventory. | + | * X Recoil DTS cable. |
− | * | + | ** Took full photo inventory and sketched a map of layers and markers. |
+ | * ! Snow thermister deployment protocol. | ||
+ | ** Alex or Ned will deploy Thermisters prior to significant storms. | ||
* General painting and site cleanup. | * General painting and site cleanup. | ||
− | * Reseal lysimeter w/ silocone. | + | ** painted support posts on top of bunker, patched up bunker roof, started painting West side. |
+ | * X Reseal lysimeter w/ silocone. | ||
+ | ** Also painted numbers on lysimeters. | ||
+ | ** ! Begin design process for new lysimeters. | ||
+ | *** Pondering hardy-backer, concrete, stone/tile | ||
+ | ** New covers, may not be needed depending on new design, ponder tarps. | ||
===IT Tech Stuff:=== | ===IT Tech Stuff:=== |
Revision as of 09:28, 7 September 2012
Contents
Questions
- Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?
- 10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.
- Heated Sonic Anemometer?
- No action on this for 2012.
Notes
- 20120904.10:34 down clear radiometer swapped out.
New Stuff
- Solid state mux?
- Kerry to order and ship out this fall.
- Green LiDAR?
- Doubtful and the current LiDAR should be fine for another season as is.
- Snow Pillow from Gherke.
- Need to call Frank.
- ?MASC needs? (Ned)
Replace/Rebuild/Reinstall/Recalibrate
- X radiometers: Done on 20120904.
- Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.
- ! Kerry will calibrate and send spares back to CUES this fall.
- ! Sutron: Email to vendor on 20120907.
- ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.
- LiDAR
- Doesn't need updating, stored in bunker, re-deploy before first storm.
- Soil moisture probe replacement.
- ! Kerry to ship calibrated probes to Alex.
- ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.
- Drains are 1.5"
- Do something to accommodate 3/4" chimney drain on South Wall.
- North Wall: 30"x30"x6"ish (2 drains at 2.5", 2 @ 2")
- South Wall: 30"wide x 24"tall x 6"ish deep. (all 4 drains @ 2")
- X Redo cable pulls w/ wire.
- West wall still needs loop built into end in bunker.
- X Recoil DTS cable.
- Took full photo inventory and sketched a map of layers and markers.
- ! Snow thermister deployment protocol.
- Alex or Ned will deploy Thermisters prior to significant storms.
- General painting and site cleanup.
- painted support posts on top of bunker, patched up bunker roof, started painting West side.
- X Reseal lysimeter w/ silocone.
- Also painted numbers on lysimeters.
- ! Begin design process for new lysimeters.
- Pondering hardy-backer, concrete, stone/tile
- New covers, may not be needed depending on new design, ponder tarps.
IT Tech Stuff:
- DONE: Netgear switch (mtc)
- Would be nice to have a 16-24 port silent gig switch.
- Inventory of items for calibration/overhaul.
- Replace Win VM? (mtc)
- Spare linksys wireless/firewall? (mtc)
- Bring one up this fall or whenever from UCSB.
- Network overhaul with VPN?
- No, not really needed.
- Fix the frigging PST/PDT issue on the Mac. (mtc)
Programming/scripting/processing
- (mtc) LiDAR error checking.
- (Dave+Adam/mtc) LiDAR auto processing.
- (Ned/mtc) Realtime MASC filter & display?