TLC-2011

From Cues
Revision as of 13:20, 17 August 2010 by Cues (talk | contribs) (Created page with 'Kerry: Scope logistics to calibrate shadow band and make it so. Overhaul tipping bucket mounts. Snow Pillow. Heated Anemometer, Fall 2010 or Winter 2011.')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Kerry: Scope logistics to calibrate shadow band and make it so.

Overhaul tipping bucket mounts.

Snow Pillow.

Heated Anemometer, Fall 2010 or Winter 2011.