TLC-2013

From Cues
Revision as of 10:15, 7 September 2012 by Cues (talk | contribs)
Jump to navigationJump to search

Lysimiter ReDesign

  • Single show style drain w/ raised filter/screen
  • HardyBacker w/ metal lip/rim?
  • Concrete w/ a mold?
  • Consider running gopher wire/mesh below perimeter to prevent undermining.

Soil Thermisters

  • Deploy additional soil depth thermisters near soil moisture probes.
    • Try using vacuum on wet'd soil to "drill" new holes.

Ground level bunker access

  • Install water meter style access ports at north and south walls.
  • Install a 4" periscope style access port up on the south wall w/ a 90 facing down.

UpSize conduit to 4" on east platform run

  • Re-Do the East side, South run of conduit to 4"
  • Possibly the East side North run at the same time.

Silent MUX

  • 3 Multiplexers:
    • Soil Temp
    • Snow Temp
    • Soil Moisture

Network

  • 16+port quiet switch
  • Wireless

SPN

  • Spare?
  • Pull down in July of 2013 and send in for calibration.

MASC

  • real time image display
  • figure out cabling issues.
    • Ponder installing Mini on platform.