TLC-2013
From Cues
Jump to navigationJump to search
Contents
Lysimiter ReDesign
- Single show style drain w/ raised filter/screen
- HardyBacker w/ metal lip/rim?
- Concrete w/ a mold?
- Consider running gopher wire/mesh below perimeter to prevent undermining.
Soil Thermisters
- Deploy additional soil depth thermisters near soil moisture probes.
- Try using vacuum on wet'd soil to "drill" new holes.
Ground level bunker access
- Install water meter style access ports at north and south walls.
- Install a 4" periscope style access port up on the south wall w/ a 90 facing down.
UpSize conduit to 4" on east platform run
- Re-Do the East side, South run of conduit to 4"
- Possibly the East side North run at the same time.
Silent MUX
- 3 Multiplexers:
- Soil Temp
- Snow Temp
- Soil Moisture
Network
- 16+port quiet switch
- Wireless
SPN
- Spare?
- Pull down in July of 2013 and send in for calibration.