===Lysimiter ReDesign=== | ===Lysimiter ReDesign=== | ||
− | * Single | + | * Single shower style drain w/ raised filter/screen |
* HardyBacker w/ metal lip/rim? | * HardyBacker w/ metal lip/rim? | ||
* Concrete w/ a mold? | * Concrete w/ a mold? | ||
Line 36: | Line 36: | ||
===MASC=== | ===MASC=== | ||
* real time image display | * real time image display | ||
− | * | + | |
− | ** | + | ===Tipping Bucket Redesign=== |
+ | * Inflow at north is 2inch, 1.5inch at south. | ||
+ | * Outflow is 1.5inch at both. | ||
+ | * 7 tipping buckets at site now. Think about replacing all of them. | ||
+ | |||
+ | ===Misc=== | ||
+ | * Try to get a quiet switch | ||
+ | * Ping Kerry on solidstate muxes. | ||
+ | * Need new wireless for site. | ||
+ | * New UPS? | ||
+ | * Plan on redoing all the computer cabling. | ||
+ | * Pull out old hillslope runnoff unit? |
Latest revision as of 09:54, 28 May 2013
Contents
Lysimiter ReDesign
- Single shower style drain w/ raised filter/screen
- HardyBacker w/ metal lip/rim?
- Concrete w/ a mold?
- Consider running gopher wire/mesh below perimeter to prevent undermining.
Soil Thermisters
- Replace soil thermisters w/ calibrated units?
- Is there any way to build in a coupling on the wiring?
- If not, we should probably install conduit for these runs.
Ground level bunker access
- Install water meter style access ports at north and south walls?
- Install a 4" SLB or LB up on the south wall w/ a 90 facing down.
- SLB: Service "Service Ell" bodies (SLBs), shorter ells with inlets flush with the access cover, are frequently used where a circuit passes through an exterior wall from outside to inside... from [1]
UpSize conduit to 4" on east platform run
- Re-Do the East side, South run of conduit to 4"
- Possibly the East side North run at the same time.
- Use LB's to deal w/ turns rather than sweep 90's since the turn is too tight for a 4" sweep.
Silent MUX
- 3 Multiplexers:
- Soil Temp
- Snow Temp
- Soil Moisture
Network
- 16+port quiet switch
- Wireless
SPN
- Spare?
- Pull down in July of 2013 and send in for calibration.
MASC
- real time image display
Tipping Bucket Redesign
- Inflow at north is 2inch, 1.5inch at south.
- Outflow is 1.5inch at both.
- 7 tipping buckets at site now. Think about replacing all of them.
Misc
- Try to get a quiet switch
- Ping Kerry on solidstate muxes.
- Need new wireless for site.
- New UPS?
- Plan on redoing all the computer cabling.
- Pull out old hillslope runnoff unit?