Site overhall/TLC week of 2011-09-18->23 w/ Kerry Claffey, Alex Clayton, Michael Colee.
 +
 
==2011 ToDo Items==
 
==2011 ToDo Items==
  
*Questions:
+
===Questions:===
**What's up w/ the fiber cable spool?
+
*What's up w/ the fiber cable spool?
**Does the fiber cable on the ground need picking up/documenting?
+
**Pull from site, store at Dozier's.
 
+
*How tuff to relocate the vertical DTS temp probe?
  
*Shopping List:
+
===Shopping List:===
**Wire for cable pulls.
+
*Wire for cable pulls.
***Get dimensions.
+
**Get dimensions. 140' plus ferrals and crimpers.
**Industrial Strength Twist Ties.
+
*Roll or two of E-Tape.
**Wire brush for paint cleanup.
+
*Industrial Strength Twist Ties.
**Number stencils and black spray paint.
 
  
**X-Sawzall blades.
+
*X-Sawzall blades.
**X-Dykes.
+
*X-Dykes.
**X-Fine tip sharpies.
+
*X-Fine tip sharpies.
**X-Silver Sharpie.
+
*X-Silver Sharpie.
 +
*X-Shelving: 17"x 4-6'
 +
*X-Swap wire wheels for paint cleanup.
 +
*X-Number stencils and black spray paint.
 +
*X-5" posts for SPN1
  
*Sensors:
+
===Sensors:===
**Replace soil moisture probes.
 
**Replace radiometers.
 
**Relocate SPN1 Sunshine pyronometer.
 
**Install Doppler Precip Gauge.
 
**Check depth pingers
 
**Reinstall LiDAR
 
**Calibrate Tipping Buckets
 
**Replace cable pulls w/ wire...
 
**CCClone Mac.
 
**Temperature Probe into LiDAR enclosure.
 
**Re-enter waypoints into GUI interface of camera.
 
**CCClone Drive.
 
  
*Demo:
+
*Temperature Probe into LiDAR enclosure.
**Pull out big lysimeter and drain box.
+
*Calibrate Tipping Buckets
**Decommision MUX1
+
*Replace cable pulls w/ wire...
**Pull Macalu receiver.
+
*CCClone Mac.
  
**X-Remove old shadow-band.
+
*X-Replace radiometers.
**X-Pull out Johnson snow pillow
+
*X-Relocate SPN1 Sunshine pyronometer.
**X-Pull out mini snow pillow below Boom Pinger.
+
*X-Install Doppler Precip Gauge.
 +
*X-Replace soil moisture probes.
 +
*X-Reinstall LiDAR
 +
*X-Check depth pingers
 +
*X-Re-enter waypoints into GUI interface of camera.
 +
*X-Update Camera SiteTour.
 +
*X-re-roll DTS fiber cable and stash on ladder.
 +
*X-grid the ground layer of DTS fiber cable.
  
*Fabrication:
+
===Demo:===
**Frank Gherke Snow Pillow?  ...or two?
+
*X-Pull out big lysimeter and drain box.
**Shelf for Aethalometer next to phone on W wall.
+
*Decommission MUX1
**Mount LiDAR power boxes left of incoming fiber on S Wall.
+
*X-Pull Macalu receiver.
**Paint.
+
*X-Remove old shadow-band.
**Numbers on I-Beam
+
*X-Pull out Johnson snow pillow
**Resolve Alex wiki passwd issue.
+
*X-Pull out mini snow pillow below Boom Pinger.
  
 +
===Fabrication:===
 +
*Frank Gherke Snow Pillow?  ...or two?
 +
*Shelf for Aethalometer next to phone on W wall.
 +
*Paint.
 +
*Numbers on I-Beam
 +
*Resolve Alex wiki passwd issue.
 
**X-Plumb Chimney Drain.
 
**X-Plumb Chimney Drain.
**X-One more bamboo hole west of platform.
+
*X-One more bamboo hole west of platform.
 +
*X-Mount LiDAR power boxes left of incoming fiber on S Wall.
  
 
==Post 2010 Notes:==
 
==Post 2010 Notes:==

Latest revision as of 14:10, 7 June 2012

Site overhall/TLC week of 2011-09-18->23 w/ Kerry Claffey, Alex Clayton, Michael Colee.

2011 ToDo Items

Questions:

  • What's up w/ the fiber cable spool?
    • Pull from site, store at Dozier's.
  • How tuff to relocate the vertical DTS temp probe?

Shopping List:

  • Wire for cable pulls.
    • Get dimensions. 140' plus ferrals and crimpers.
  • Roll or two of E-Tape.
  • Industrial Strength Twist Ties.
  • X-Sawzall blades.
  • X-Dykes.
  • X-Fine tip sharpies.
  • X-Silver Sharpie.
  • X-Shelving: 17"x 4-6'
  • X-Swap wire wheels for paint cleanup.
  • X-Number stencils and black spray paint.
  • X-5" posts for SPN1

Sensors:

  • Temperature Probe into LiDAR enclosure.
  • Calibrate Tipping Buckets
  • Replace cable pulls w/ wire...
  • CCClone Mac.
  • X-Replace radiometers.
  • X-Relocate SPN1 Sunshine pyronometer.
  • X-Install Doppler Precip Gauge.
  • X-Replace soil moisture probes.
  • X-Reinstall LiDAR
  • X-Check depth pingers
  • X-Re-enter waypoints into GUI interface of camera.
  • X-Update Camera SiteTour.
  • X-re-roll DTS fiber cable and stash on ladder.
  • X-grid the ground layer of DTS fiber cable.

Demo:

  • X-Pull out big lysimeter and drain box.
  • Decommission MUX1
  • X-Pull Macalu receiver.
  • X-Remove old shadow-band.
  • X-Pull out Johnson snow pillow
  • X-Pull out mini snow pillow below Boom Pinger.

Fabrication:

  • Frank Gherke Snow Pillow? ...or two?
  • Shelf for Aethalometer next to phone on W wall.
  • Paint.
  • Numbers on I-Beam
  • Resolve Alex wiki passwd issue.
    • X-Plumb Chimney Drain.
  • X-One more bamboo hole west of platform.
  • X-Mount LiDAR power boxes left of incoming fiber on S Wall.

Post 2010 Notes:

Heated Sonic Anemometer: $5500

  • Aiming at winter 2011 installation, waiting for budget stuff before purchase.

Precip Guage (Bert has no faith so unless it's free, bail on this):

  • Folks at Mt. Washington have something that werks, Kerry looking into wind shield and pricing.
  • Jesse also had this to add:
re:on Precip gauges:

http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm
http://www.fondriest.com/products/hydreon_rg-11.htm
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp

And the one I was really in favor of trying a couple years ago...

http://www.thiesclima.com/disdrometer.html

Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.

Soil Moisture Probes:

  • Need overhaul and re-installation w/ tubes.
  • Also these units for less than $150 each that both Jesse and Kerry recommend.

Snow Pillow: $10K

  • Bert saw something that looked reasonable at AGU
  • Jerry Johnson has his setup.

Overhaul tipping bucket mounts.

Chores:

  • Paint remote boom and re-do depth markings so we can see them from the camera.
  • Reinstall soil moisture probes.