<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://wiki-cues.eri.ucsb.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Cues</id>
	<title>Cues - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://wiki-cues.eri.ucsb.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Cues"/>
	<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/Special:Contributions/Cues"/>
	<updated>2026-04-11T07:11:48Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.0</generator>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=218</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=218"/>
		<updated>2015-03-26T18:24:05Z</updated>

		<summary type="html">&lt;p&gt;Cues: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 8.12.165.155 from anywhere. &lt;br /&gt;
&lt;br /&gt;
20150324: 1.75Mbps download, 0.17Mbps upload.&lt;br /&gt;
20150326: 1.81Mbps download, 0.21Mbps upload.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
*2014-CUES-Win: 165 385 363&lt;br /&gt;
*2014-New CUES-Mac: 164 092 848&lt;br /&gt;
Older entries&lt;br /&gt;
*CUES-Win-new: 294 636 003&lt;br /&gt;
*CUES-Mac: 173 704 513&lt;br /&gt;
*New CUES-Win: 294 594 032&lt;br /&gt;
*MASC: 974 763 535&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh c...@8.12.165.155 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh c...@192.168.0.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Data Loggers:&lt;br /&gt;
*CR3000-1: IP: 192.168.0.101&lt;br /&gt;
*CR3000-2: IP: 192.168.0.102&lt;br /&gt;
*CR3000-3: IP: 192.168.0.103&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.234&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=217</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=217"/>
		<updated>2015-03-24T21:30:23Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* TeamViewer */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 8.12.165.155 from anywhere. &lt;br /&gt;
&lt;br /&gt;
20150324: 1.75Mbps download, 0.17Mbps upload.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
*2014-CUES-Win: 165 385 363&lt;br /&gt;
*2014-New CUES-Mac: 164 092 848&lt;br /&gt;
Older entries&lt;br /&gt;
*CUES-Win-new: 294 636 003&lt;br /&gt;
*CUES-Mac: 173 704 513&lt;br /&gt;
*New CUES-Win: 294 594 032&lt;br /&gt;
*MASC: 974 763 535&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh c...@8.12.165.155 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh c...@192.168.0.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Data Loggers:&lt;br /&gt;
*CR3000-1: IP: 192.168.0.101&lt;br /&gt;
*CR3000-2: IP: 192.168.0.102&lt;br /&gt;
*CR3000-3: IP: 192.168.0.103&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.234&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=205</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=205"/>
		<updated>2012-12-08T02:07:30Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* TeamViewer */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Win-new: 294 636 003&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
New CUES-Mac (201212): 164 092 848&lt;br /&gt;
New CUES-Win(201212): 294 594 032&lt;br /&gt;
&lt;br /&gt;
MASC: 974 763 535&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh cues@192.168.0.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Data Loggers:&lt;br /&gt;
*CR3000-1: IP: 192.168.0.101&lt;br /&gt;
*CR3000-2: IP: 192.168.0.102&lt;br /&gt;
*CR3000-3: IP: 192.168.0.103&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.234&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=204</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=204"/>
		<updated>2012-12-08T00:24:25Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* TeamViewer */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Win-new: 294 636 003&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
New CUES-Mac (201212): 164 092 848&lt;br /&gt;
&lt;br /&gt;
MASC: 974 763 535&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh cues@192.168.0.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Data Loggers:&lt;br /&gt;
*CR3000-1: IP: 192.168.0.101&lt;br /&gt;
*CR3000-2: IP: 192.168.0.102&lt;br /&gt;
*CR3000-3: IP: 192.168.0.103&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.234&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=202</id>
		<title>TLC-2013</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=202"/>
		<updated>2012-09-08T18:58:51Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Ground level bunker access */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Lysimiter ReDesign===&lt;br /&gt;
* Single show style drain w/ raised filter/screen&lt;br /&gt;
* HardyBacker w/ metal lip/rim?&lt;br /&gt;
* Concrete w/ a mold?&lt;br /&gt;
* Consider running gopher wire/mesh below perimeter to prevent undermining.&lt;br /&gt;
&lt;br /&gt;
===Soil Thermisters===&lt;br /&gt;
* Replace soil thermisters w/ calibrated units?&lt;br /&gt;
** Is there any way to build in a coupling on the wiring?&lt;br /&gt;
** If not, we should probably install conduit for these runs.&lt;br /&gt;
&lt;br /&gt;
===Ground level bunker access===&lt;br /&gt;
* Install water meter style access ports at north and south walls?&lt;br /&gt;
* Install a 4&amp;quot; SLB or LB up on the south wall w/ a 90 facing down.&lt;br /&gt;
** SLB: Service &amp;quot;Service Ell&amp;quot; bodies (SLBs), shorter ells with inlets flush with the access cover, are frequently used where a circuit passes through an exterior wall from outside to inside... from [http://en.wikipedia.org/wiki/Electrical_conduit]&lt;br /&gt;
&lt;br /&gt;
===UpSize conduit to 4&amp;quot; on east platform run===&lt;br /&gt;
* Re-Do the East side, South run of conduit to 4&amp;quot;&lt;br /&gt;
* Possibly the East side North run at the same time.&lt;br /&gt;
* Use LB's to deal w/ turns rather than sweep 90's since the turn is too tight for a 4&amp;quot; sweep.&lt;br /&gt;
&lt;br /&gt;
===Silent MUX===&lt;br /&gt;
*3 Multiplexers:&lt;br /&gt;
**Soil Temp&lt;br /&gt;
**Snow Temp&lt;br /&gt;
**Soil Moisture&lt;br /&gt;
&lt;br /&gt;
===Network===&lt;br /&gt;
* 16+port quiet switch&lt;br /&gt;
* Wireless&lt;br /&gt;
&lt;br /&gt;
===SPN===&lt;br /&gt;
*Spare?&lt;br /&gt;
*Pull down in July of 2013 and send in for calibration.&lt;br /&gt;
&lt;br /&gt;
===MASC===&lt;br /&gt;
* real time image display&lt;br /&gt;
* figure out cabling issues.&lt;br /&gt;
** Ponder installing Mini on platform.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=201</id>
		<title>TLC-2013</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=201"/>
		<updated>2012-09-08T18:58:25Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* UpSize conduit to 4&amp;quot; on east platform run */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Lysimiter ReDesign===&lt;br /&gt;
* Single show style drain w/ raised filter/screen&lt;br /&gt;
* HardyBacker w/ metal lip/rim?&lt;br /&gt;
* Concrete w/ a mold?&lt;br /&gt;
* Consider running gopher wire/mesh below perimeter to prevent undermining.&lt;br /&gt;
&lt;br /&gt;
===Soil Thermisters===&lt;br /&gt;
* Replace soil thermisters w/ calibrated units?&lt;br /&gt;
** Is there any way to build in a coupling on the wiring?&lt;br /&gt;
** If not, we should probably install conduit for these runs.&lt;br /&gt;
&lt;br /&gt;
===Ground level bunker access===&lt;br /&gt;
* Install water meter style access ports at north and south walls.&lt;br /&gt;
* Install a 4&amp;quot; SLB or LB up on the south wall w/ a 90 facing down.&lt;br /&gt;
** SLB: Service &amp;quot;Service Ell&amp;quot; bodies (SLBs), shorter ells with inlets flush with the access cover, are frequently used where a circuit passes through an exterior wall from outside to inside... from [http://en.wikipedia.org/wiki/Electrical_conduit]&lt;br /&gt;
&lt;br /&gt;
===UpSize conduit to 4&amp;quot; on east platform run===&lt;br /&gt;
* Re-Do the East side, South run of conduit to 4&amp;quot;&lt;br /&gt;
* Possibly the East side North run at the same time.&lt;br /&gt;
* Use LB's to deal w/ turns rather than sweep 90's since the turn is too tight for a 4&amp;quot; sweep.&lt;br /&gt;
&lt;br /&gt;
===Silent MUX===&lt;br /&gt;
*3 Multiplexers:&lt;br /&gt;
**Soil Temp&lt;br /&gt;
**Snow Temp&lt;br /&gt;
**Soil Moisture&lt;br /&gt;
&lt;br /&gt;
===Network===&lt;br /&gt;
* 16+port quiet switch&lt;br /&gt;
* Wireless&lt;br /&gt;
&lt;br /&gt;
===SPN===&lt;br /&gt;
*Spare?&lt;br /&gt;
*Pull down in July of 2013 and send in for calibration.&lt;br /&gt;
&lt;br /&gt;
===MASC===&lt;br /&gt;
* real time image display&lt;br /&gt;
* figure out cabling issues.&lt;br /&gt;
** Ponder installing Mini on platform.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=200</id>
		<title>TLC-2013</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=200"/>
		<updated>2012-09-08T18:57:42Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Ground level bunker access */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Lysimiter ReDesign===&lt;br /&gt;
* Single show style drain w/ raised filter/screen&lt;br /&gt;
* HardyBacker w/ metal lip/rim?&lt;br /&gt;
* Concrete w/ a mold?&lt;br /&gt;
* Consider running gopher wire/mesh below perimeter to prevent undermining.&lt;br /&gt;
&lt;br /&gt;
===Soil Thermisters===&lt;br /&gt;
* Replace soil thermisters w/ calibrated units?&lt;br /&gt;
** Is there any way to build in a coupling on the wiring?&lt;br /&gt;
** If not, we should probably install conduit for these runs.&lt;br /&gt;
&lt;br /&gt;
===Ground level bunker access===&lt;br /&gt;
* Install water meter style access ports at north and south walls.&lt;br /&gt;
* Install a 4&amp;quot; SLB or LB up on the south wall w/ a 90 facing down.&lt;br /&gt;
** SLB: Service &amp;quot;Service Ell&amp;quot; bodies (SLBs), shorter ells with inlets flush with the access cover, are frequently used where a circuit passes through an exterior wall from outside to inside... from [http://en.wikipedia.org/wiki/Electrical_conduit]&lt;br /&gt;
&lt;br /&gt;
===UpSize conduit to 4&amp;quot; on east platform run===&lt;br /&gt;
* Re-Do the East side, South run of conduit to 4&amp;quot;&lt;br /&gt;
* Possibly the East side North run at the same time.&lt;br /&gt;
&lt;br /&gt;
===Silent MUX===&lt;br /&gt;
*3 Multiplexers:&lt;br /&gt;
**Soil Temp&lt;br /&gt;
**Snow Temp&lt;br /&gt;
**Soil Moisture&lt;br /&gt;
&lt;br /&gt;
===Network===&lt;br /&gt;
* 16+port quiet switch&lt;br /&gt;
* Wireless&lt;br /&gt;
&lt;br /&gt;
===SPN===&lt;br /&gt;
*Spare?&lt;br /&gt;
*Pull down in July of 2013 and send in for calibration.&lt;br /&gt;
&lt;br /&gt;
===MASC===&lt;br /&gt;
* real time image display&lt;br /&gt;
* figure out cabling issues.&lt;br /&gt;
** Ponder installing Mini on platform.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=199</id>
		<title>TLC-2013</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=199"/>
		<updated>2012-09-08T18:50:01Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Soil Thermisters */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Lysimiter ReDesign===&lt;br /&gt;
* Single show style drain w/ raised filter/screen&lt;br /&gt;
* HardyBacker w/ metal lip/rim?&lt;br /&gt;
* Concrete w/ a mold?&lt;br /&gt;
* Consider running gopher wire/mesh below perimeter to prevent undermining.&lt;br /&gt;
&lt;br /&gt;
===Soil Thermisters===&lt;br /&gt;
* Replace soil thermisters w/ calibrated units?&lt;br /&gt;
** Is there any way to build in a coupling on the wiring?&lt;br /&gt;
** If not, we should probably install conduit for these runs.&lt;br /&gt;
&lt;br /&gt;
===Ground level bunker access===&lt;br /&gt;
* Install water meter style access ports at north and south walls.&lt;br /&gt;
* Install a 4&amp;quot; periscope style access port up on the south wall w/ a 90 facing down.&lt;br /&gt;
&lt;br /&gt;
===UpSize conduit to 4&amp;quot; on east platform run===&lt;br /&gt;
* Re-Do the East side, South run of conduit to 4&amp;quot;&lt;br /&gt;
* Possibly the East side North run at the same time.&lt;br /&gt;
&lt;br /&gt;
===Silent MUX===&lt;br /&gt;
*3 Multiplexers:&lt;br /&gt;
**Soil Temp&lt;br /&gt;
**Snow Temp&lt;br /&gt;
**Soil Moisture&lt;br /&gt;
&lt;br /&gt;
===Network===&lt;br /&gt;
* 16+port quiet switch&lt;br /&gt;
* Wireless&lt;br /&gt;
&lt;br /&gt;
===SPN===&lt;br /&gt;
*Spare?&lt;br /&gt;
*Pull down in July of 2013 and send in for calibration.&lt;br /&gt;
&lt;br /&gt;
===MASC===&lt;br /&gt;
* real time image display&lt;br /&gt;
* figure out cabling issues.&lt;br /&gt;
** Ponder installing Mini on platform.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=198</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=198"/>
		<updated>2012-09-08T01:13:48Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Bug MTC about site picture repository.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
* Install calibrated temp/RH sensor when Kerry ships it... remind Kerry.&lt;br /&gt;
* Install replacement dome on camera when it arrives.&lt;br /&gt;
* Check and recharge desiccant on radiometers.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
* Calibrate and ship thermister strings.&lt;br /&gt;
* Calibrate and ship temp/RH sensor.&lt;br /&gt;
* Order replacement dome.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
* Ship DIMP to CRREL&lt;br /&gt;
* Dump gamma sensors in EWaste&lt;br /&gt;
* Dump fiber string in EWaste&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
* MASC&lt;br /&gt;
** Relocate mini to tower next to MASC unit?&lt;br /&gt;
*** Headless w/ VNC/TeamViewer access.&lt;br /&gt;
*** Possible to run HDMI and USB to bunker for when direct access is needed.&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=197</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=197"/>
		<updated>2012-09-08T01:12:29Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Bug MTC about site picture repository.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
* Install calibrated temp/RH sensor when Kerry ships it... remind Kerry.&lt;br /&gt;
* Install replacement dome on camera when it arrives.&lt;br /&gt;
* Check and recharge desiccant on radiometers.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
* Calibrate and ship thermister strings.&lt;br /&gt;
* Calibrate and ship temp/RH sensor.&lt;br /&gt;
* Order replacement dome.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
* MASC&lt;br /&gt;
** Relocate mini to tower next to MASC unit?&lt;br /&gt;
*** Headless w/ VNC/TeamViewer access.&lt;br /&gt;
*** Possible to run HDMI and USB to bunker for when direct access is needed.&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=196</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=196"/>
		<updated>2012-09-08T01:10:25Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Bug MTC about site picture repository.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
* Install calibrated temp/RH sensor when Kerry ships it... remind Kerry.&lt;br /&gt;
* Install replacement dome on camera when it arrives.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
* Calibrate and ship thermister strings.&lt;br /&gt;
* Calibrate and ship temp/RH sensor.&lt;br /&gt;
* Order replacement dome.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
* MASC&lt;br /&gt;
** Relocate mini to tower next to MASC unit?&lt;br /&gt;
*** Headless w/ VNC/TeamViewer access.&lt;br /&gt;
*** Possible to run HDMI and USB to bunker for when direct access is needed.&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=195</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=195"/>
		<updated>2012-09-07T20:49:29Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Bug MTC about site picture repository.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
* Install calibrated temp/RH sensor when Kerry ships it... remind Kerry.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* Calibrate and ship spare radiometers.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
* Calibrate and ship thermister strings for 2013 TLC installation.&lt;br /&gt;
* Calibrate and ship temp/RH sensor.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
* MASC&lt;br /&gt;
** Relocate mini to tower next to MASC unit?&lt;br /&gt;
*** Headless w/ VNC/TeamViewer access.&lt;br /&gt;
*** Possible to run HDMI and USB to bunker for when direct access is needed.&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=194</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=194"/>
		<updated>2012-09-07T20:28:45Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Bug MTC about site picture repository.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* Calibrate and ship spare radiometers.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
* Calibrate and ship thermister strings for 2013 TLC installation.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
*MASC&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=193</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=193"/>
		<updated>2012-09-07T20:26:18Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Bug MTC about site picture repository.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* Calibrate and ship spare radiometers.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
*MASC&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=192</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=192"/>
		<updated>2012-09-07T19:20:04Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Post TLC FollowUp */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
* Deploy LiDAR pre snow.&lt;br /&gt;
* Clean/clear lysimiters pre snow.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* Calibrate and ship spare radiometers.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
*MASC&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=191</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=191"/>
		<updated>2012-09-07T19:00:46Z</updated>

		<summary type="html">&lt;p&gt;Cues: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Post TLC FollowUp===&lt;br /&gt;
Alex:&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
* Need to schedule installation and logistics.&lt;br /&gt;
&lt;br /&gt;
Kerry:&lt;br /&gt;
* Calibrate and ship spare Judd depth pingers.&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* Calibrate and ship spare radiometers.&lt;br /&gt;
* Calibrate and ship spare soil moisture probes.&lt;br /&gt;
&lt;br /&gt;
MTC: &lt;br /&gt;
* Tipping bucket overhaul &lt;br /&gt;
* Network: silent 16+port switch&lt;br /&gt;
* Network: replace wireless&lt;br /&gt;
* PST/PDT issue on Mac&lt;br /&gt;
* Lidar error checking (alert when down).&lt;br /&gt;
* Lidar auto processing?&lt;br /&gt;
* Schedule Green LiDAR pre-snow capture from gun mount 1?&lt;br /&gt;
&lt;br /&gt;
Ned:&lt;br /&gt;
*MASC&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* Increased sampling rate from 5Hz to 10Hz on the sonic anemometer.&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
** MTC schlepping to UCSB for techno trash.&lt;br /&gt;
** Delivered coolers to Dozier's for eventual return to Reno.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc) No.&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=190</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=190"/>
		<updated>2012-09-07T18:35:57Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* New Stuff */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* X Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke, arriving Sunday afternoon, 20120909.&lt;br /&gt;
**Need to schedule installation and logistics.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
** ! Kerry will calibrate and send spares back to CUES this fall.&lt;br /&gt;
* ! Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=189</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=189"/>
		<updated>2012-09-07T18:34:57Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Replace/Rebuild/Reinstall/Recalibrate */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* X Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
** ! Kerry will calibrate and send spares back to CUES this fall.&lt;br /&gt;
* ! Sutron: Email to vendor on 20120907 asking about calibration schedule.&lt;br /&gt;
* ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=188</id>
		<title>TLC-2013</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=188"/>
		<updated>2012-09-07T18:15:42Z</updated>

		<summary type="html">&lt;p&gt;Cues: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Lysimiter ReDesign===&lt;br /&gt;
* Single show style drain w/ raised filter/screen&lt;br /&gt;
* HardyBacker w/ metal lip/rim?&lt;br /&gt;
* Concrete w/ a mold?&lt;br /&gt;
* Consider running gopher wire/mesh below perimeter to prevent undermining.&lt;br /&gt;
&lt;br /&gt;
===Soil Thermisters===&lt;br /&gt;
* Deploy additional soil depth thermisters near soil moisture probes.&lt;br /&gt;
** Try using vacuum on wet'd soil to &amp;quot;drill&amp;quot; new holes.&lt;br /&gt;
&lt;br /&gt;
===Ground level bunker access===&lt;br /&gt;
* Install water meter style access ports at north and south walls.&lt;br /&gt;
* Install a 4&amp;quot; periscope style access port up on the south wall w/ a 90 facing down.&lt;br /&gt;
&lt;br /&gt;
===UpSize conduit to 4&amp;quot; on east platform run===&lt;br /&gt;
* Re-Do the East side, South run of conduit to 4&amp;quot;&lt;br /&gt;
* Possibly the East side North run at the same time.&lt;br /&gt;
&lt;br /&gt;
===Silent MUX===&lt;br /&gt;
*3 Multiplexers:&lt;br /&gt;
**Soil Temp&lt;br /&gt;
**Snow Temp&lt;br /&gt;
**Soil Moisture&lt;br /&gt;
&lt;br /&gt;
===Network===&lt;br /&gt;
* 16+port quiet switch&lt;br /&gt;
* Wireless&lt;br /&gt;
&lt;br /&gt;
===SPN===&lt;br /&gt;
*Spare?&lt;br /&gt;
*Pull down in July of 2013 and send in for calibration.&lt;br /&gt;
&lt;br /&gt;
===MASC===&lt;br /&gt;
* real time image display&lt;br /&gt;
* figure out cabling issues.&lt;br /&gt;
** Ponder installing Mini on platform.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=187</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=187"/>
		<updated>2012-09-07T18:13:14Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Programming/scripting/processing */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* X Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
** ! Kerry will calibrate and send spares back to CUES this fall.&lt;br /&gt;
* ! Sutron: Email to vendor on 20120907.&lt;br /&gt;
* ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;br /&gt;
* X (mtc) reprogram data schlepping to put &amp;quot;.dat&amp;quot; at end of file names.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=186</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=186"/>
		<updated>2012-09-07T18:04:00Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Questions */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* X Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** Probably not really necessary until someone is gonna be actively using turbulent calc's during those times.&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
** ! Kerry will calibrate and send spares back to CUES this fall.&lt;br /&gt;
* ! Sutron: Email to vendor on 20120907.&lt;br /&gt;
* ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=185</id>
		<title>TLC-2013</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2013&amp;diff=185"/>
		<updated>2012-09-07T17:46:46Z</updated>

		<summary type="html">&lt;p&gt;Cues: Created page with '===Lysimiter ReDesign=== * Single show style drain w/ raised filter/screen * HardyBacker w/ metal lip/rim? * Concrete w/ a mold? * Consider running gopher wire/mesh below perimet…'&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Lysimiter ReDesign===&lt;br /&gt;
* Single show style drain w/ raised filter/screen&lt;br /&gt;
* HardyBacker w/ metal lip/rim?&lt;br /&gt;
* Concrete w/ a mold?&lt;br /&gt;
* Consider running gopher wire/mesh below perimeter to prevent undermining.&lt;br /&gt;
&lt;br /&gt;
===Soil Thermisters===&lt;br /&gt;
* Deploy additional soil depth thermisters near soil moisture probes.&lt;br /&gt;
** Try using vacuum on wet'd soil to &amp;quot;drill&amp;quot; new holes.&lt;br /&gt;
&lt;br /&gt;
===Ground level bunker access===&lt;br /&gt;
* Install water meter style access ports at north and south walls.&lt;br /&gt;
* Install a 4&amp;quot; periscope style access port up on the south wall w/ a 90 facing down.&lt;br /&gt;
&lt;br /&gt;
===UpSize conduit to 4&amp;quot; on east platform run===&lt;br /&gt;
* Re-Do the East side, South run of conduit to 4&amp;quot;&lt;br /&gt;
* Possibly the East side North run at the same time.&lt;br /&gt;
&lt;br /&gt;
===Silent MUX===&lt;br /&gt;
*3 Multiplexers:&lt;br /&gt;
**Soil Temp&lt;br /&gt;
**Snow Temp&lt;br /&gt;
**Soil Moisture&lt;br /&gt;
&lt;br /&gt;
===Network===&lt;br /&gt;
* 16+port quiet switch&lt;br /&gt;
* Wireless&lt;br /&gt;
&lt;br /&gt;
===SPN===&lt;br /&gt;
*Spare?&lt;br /&gt;
*Pull down in July of 2013 and send in for calibration.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Main_Page&amp;diff=184</id>
		<title>Main Page</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Main_Page&amp;diff=184"/>
		<updated>2012-09-07T17:29:00Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* TLC-2012 */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;big&amp;gt;'''Welcome to the CUES Wiki (Crrel Ucsb Eastern Sierra Snow Study Site)'''&amp;lt;/big&amp;gt;&lt;br /&gt;
&lt;br /&gt;
The wiki is bare but we'll be getting things going soon... for now, here's a link to the [http://wiki.snow.ucsb.edu:8888/snow/5 old site].&lt;br /&gt;
&lt;br /&gt;
Data is accessed [http://www.snow.ucsb.edu/cues here].&lt;br /&gt;
&lt;br /&gt;
Consult the [http://meta.wikimedia.org/wiki/Help:Contents User's Guide] for information on using the wiki software.&lt;br /&gt;
&lt;br /&gt;
== Getting started ==&lt;br /&gt;
&lt;br /&gt;
* [http://www.mediawiki.org/wiki/Help:Configuration_settings Configuration settings list]&lt;br /&gt;
* [http://www.mediawiki.org/wiki/Help:FAQ MediaWiki FAQ]&lt;br /&gt;
* [http://mail.wikimedia.org/mailman/listinfo/mediawiki-announce MediaWiki release mailing list]&lt;br /&gt;
&lt;br /&gt;
==[[Data Loggers]]==&lt;br /&gt;
&lt;br /&gt;
==[[Instrumentation]]==&lt;br /&gt;
&lt;br /&gt;
==[[Site Camera]]==&lt;br /&gt;
&lt;br /&gt;
==[[Site Computer]]==&lt;br /&gt;
&lt;br /&gt;
==[[Site Description]]==&lt;br /&gt;
&lt;br /&gt;
==[[Site Networking]]==&lt;br /&gt;
&lt;br /&gt;
==[[TLC-2010]]==&lt;br /&gt;
&lt;br /&gt;
==[[TLC-2011]]==&lt;br /&gt;
&lt;br /&gt;
==[[TLC-2012]]==&lt;br /&gt;
==[[TLC-2013]]==&lt;br /&gt;
&lt;br /&gt;
==[[Wish List]]==&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Need to setup a &amp;quot;Daily Jounal page&amp;quot;, a TLC page, wish-list page... setup a CUES gmail account, pigtail and another power strip for site.&lt;br /&gt;
&lt;br /&gt;
20100323-Tue-1300:&lt;br /&gt;
*MTC/Bert/Dozier/ESM236 site tour: jacked up CO2 sensor.&lt;br /&gt;
*Clear, slight wind.&lt;br /&gt;
&lt;br /&gt;
20100322-Mon: &lt;br /&gt;
*MTC and Pete Gadomski LiDAR scan of the site.&lt;br /&gt;
**Windy, mostly clear.  ~2deg C.&lt;br /&gt;
&lt;br /&gt;
20100210-Wed:&lt;br /&gt;
*MTC and Pete Gadomski did a LiDAR scan of the site.  Went well.&lt;br /&gt;
&lt;br /&gt;
20100209-Tue: &lt;br /&gt;
*MTC and Pete Gadomski installed targets on platform and around site for LiDAR scans.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==[[Inuit Words for Snow]]==&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=183</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=183"/>
		<updated>2012-09-07T17:28:31Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Replace/Rebuild/Reinstall/Recalibrate */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* X radiometers: Done on 20120904.&lt;br /&gt;
* Depth pingers: Replaced Cambell on 20120904 or 05, Judds seem fine.&lt;br /&gt;
** ! Kerry will calibrate and send spares back to CUES this fall.&lt;br /&gt;
* ! Sutron: Email to vendor on 20120907.&lt;br /&gt;
* ! Anemometers: replaced wind vane, Kerry to service spare and return to CUES.&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** ! Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* ! Lysimeter tipping bucket overhaul (MTC): ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* X Redo cable pulls w/ wire.&lt;br /&gt;
** West wall still needs loop built into end in bunker.&lt;br /&gt;
* X Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory and sketched a map of layers and markers.&lt;br /&gt;
* ! Snow thermister deployment protocol.&lt;br /&gt;
** Alex or Ned will deploy Thermisters prior to significant storms.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
** painted support posts on top of bunker, patched up bunker roof, started painting West side.&lt;br /&gt;
* X Reseal lysimeter w/ silocone.&lt;br /&gt;
** Also painted numbers on lysimeters.&lt;br /&gt;
** ! Begin design process for new lysimeters.&lt;br /&gt;
*** Pondering hardy-backer, concrete, stone/tile&lt;br /&gt;
** New covers, may not be needed depending on new design, ponder tarps.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=182</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=182"/>
		<updated>2012-09-06T22:43:19Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Replace/Rebuild/Reinstall/Recalibrate */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* Lysimeter tipping bucket overhaul: ideally put them side by side in a single row and down low, close to floor.&lt;br /&gt;
**Drains are 1.5&amp;quot;&lt;br /&gt;
**Do something to accommodate 3/4&amp;quot; chimney drain on South Wall.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
* Reseal lysimeter w/ silocone.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=181</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=181"/>
		<updated>2012-09-06T22:31:53Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Replace/Rebuild/Reinstall/Recalibrate */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* Lysimeter tipping bucket overhaul.&lt;br /&gt;
**North Wall: 30&amp;quot;x30&amp;quot;x6&amp;quot;ish (2 drains at 2.5&amp;quot;, 2 @ 2&amp;quot;)&lt;br /&gt;
**South Wall: 30&amp;quot;wide x 24&amp;quot;tall x 6&amp;quot;ish deep. (all 4 drains @ 2&amp;quot;)&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
* Reseal lysimeter w/ silocone.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=180</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=180"/>
		<updated>2012-09-04T23:47:19Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Replace/Rebuild/Reinstall/Recalibrate */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
** Doesn't need updating, stored in bunker, re-deploy before first storm.&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
** Kerry to ship calibrated probes to Alex.&lt;br /&gt;
* Lysimeter tipping bucket overhaul.&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Took full photo inventory.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
* Reseal lysimeter w/ silocone.&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=179</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=179"/>
		<updated>2012-09-04T23:43:29Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* New Stuff */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
** Kerry to order and ship out this fall.&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
** Need to call Frank.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
* Lysimeter tipping bucket overhaul.&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=178</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=178"/>
		<updated>2012-09-04T23:39:51Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* IT Tech Stuff: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
* Lysimeter tipping bucket overhaul.&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* DONE: Netgear switch (mtc)&lt;br /&gt;
** Would be nice to have a 16-24 port silent gig switch.&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
** Bring one up this fall or whenever from UCSB.&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
** No, not really needed.&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=177</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=177"/>
		<updated>2012-09-04T18:39:22Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Questions */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===Notes===&lt;br /&gt;
* 20120904.10:34 down clear radiometer swapped out.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
* Lysimeter tipping bucket overhaul.&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* Netgear switch (mtc)&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=176</id>
		<title>TLC-2012</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2012&amp;diff=176"/>
		<updated>2012-09-04T18:35:16Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Questions */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Questions===&lt;br /&gt;
* Do we want to increase sampling rate from 5Hz to 10Hz or 20Hz on the sonic anemometer?&lt;br /&gt;
**10Hz is standard for flux measurements according to Joe MacFaddon of UCSB.&lt;br /&gt;
* Heated Sonic Anemometer?&lt;br /&gt;
** No action on this for 2012.&lt;br /&gt;
&lt;br /&gt;
===New Stuff===&lt;br /&gt;
* Solid state mux?&lt;br /&gt;
* Green LiDAR?&lt;br /&gt;
** Doubtful and the current LiDAR should be fine for another season as is.&lt;br /&gt;
* Snow Pillow from Gherke.&lt;br /&gt;
* ?MASC needs? (Ned)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Replace/Rebuild/Reinstall/Recalibrate===&lt;br /&gt;
* radiometers&lt;br /&gt;
* Depth pingers&lt;br /&gt;
* Sutron?&lt;br /&gt;
* Anemometers?&lt;br /&gt;
* LiDAR&lt;br /&gt;
* Soil moisture probe replacement.&lt;br /&gt;
* Lysimeter tipping bucket overhaul.&lt;br /&gt;
* Redo cable pulls w/ wire.&lt;br /&gt;
* Recoil DTS cable.&lt;br /&gt;
** Snow thermister deployment protocol.&lt;br /&gt;
* General painting and site cleanup.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===IT Tech Stuff:===&lt;br /&gt;
* Netgear switch (mtc)&lt;br /&gt;
* Inventory of items for calibration/overhaul.&lt;br /&gt;
* Replace Win VM? (mtc)&lt;br /&gt;
* Spare linksys wireless/firewall? (mtc)&lt;br /&gt;
* Network overhaul with VPN?&lt;br /&gt;
* Fix the frigging PST/PDT issue on the Mac. (mtc)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Programming/scripting/processing===&lt;br /&gt;
* (mtc) LiDAR error checking.&lt;br /&gt;
* (Dave+Adam/mtc) LiDAR auto processing.&lt;br /&gt;
* (Ned/mtc) Realtime MASC filter &amp;amp; display?&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=154</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=154"/>
		<updated>2011-09-22T16:22:42Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Sensors: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Site overhall/TLC week of 2011-09-18-&amp;gt;23 w/ Kerry Claffey, Alex Clayton, Michael Colee.&lt;br /&gt;
&lt;br /&gt;
==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
*What's up w/ the fiber cable spool?&lt;br /&gt;
**Pull from site, store at Dozier's.&lt;br /&gt;
*How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
*Wire for cable pulls.&lt;br /&gt;
**Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
*Roll or two of E-Tape.&lt;br /&gt;
*Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
*X-Sawzall blades.&lt;br /&gt;
*X-Dykes.&lt;br /&gt;
*X-Fine tip sharpies.&lt;br /&gt;
*X-Silver Sharpie.&lt;br /&gt;
*X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
*X-Swap wire wheels for paint cleanup.&lt;br /&gt;
*X-Number stencils and black spray paint.&lt;br /&gt;
*X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
*Temperature Probe into LiDAR enclosure.&lt;br /&gt;
*Replace radiometers.&lt;br /&gt;
*Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
*Calibrate Tipping Buckets&lt;br /&gt;
*Replace cable pulls w/ wire...&lt;br /&gt;
*CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
*X-Install Doppler Precip Gauge.&lt;br /&gt;
*X-Replace soil moisture probes.&lt;br /&gt;
*X-Reinstall LiDAR&lt;br /&gt;
*X-Check depth pingers&lt;br /&gt;
*X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
*X-Update Camera SiteTour.&lt;br /&gt;
*X-re-roll DTS fiber cable and stash on ladder.&lt;br /&gt;
*X-grid the ground layer of DTS fiber cable.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
*Pull out big lysimeter and drain box.&lt;br /&gt;
*Decommission MUX1&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
*X-Remove old shadow-band.&lt;br /&gt;
*X-Pull out Johnson snow pillow&lt;br /&gt;
*X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
*Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
*Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
*Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
*Paint.&lt;br /&gt;
*Numbers on I-Beam&lt;br /&gt;
*Resolve Alex wiki passwd issue.&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
*X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=153</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=153"/>
		<updated>2011-09-22T16:22:06Z</updated>

		<summary type="html">&lt;p&gt;Cues: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Site overhall/TLC week of 2011-09-18-&amp;gt;23 w/ Kerry Claffey, Alex Clayton, Michael Colee.&lt;br /&gt;
&lt;br /&gt;
==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
*What's up w/ the fiber cable spool?&lt;br /&gt;
**Pull from site, store at Dozier's.&lt;br /&gt;
*How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
*Wire for cable pulls.&lt;br /&gt;
**Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
*Roll or two of E-Tape.&lt;br /&gt;
*Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
*X-Sawzall blades.&lt;br /&gt;
*X-Dykes.&lt;br /&gt;
*X-Fine tip sharpies.&lt;br /&gt;
*X-Silver Sharpie.&lt;br /&gt;
*X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
*X-Swap wire wheels for paint cleanup.&lt;br /&gt;
*X-Number stencils and black spray paint.&lt;br /&gt;
*X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
*Temperature Probe into LiDAR enclosure.&lt;br /&gt;
*Replace radiometers.&lt;br /&gt;
*Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
**Recable.&lt;br /&gt;
*Calibrate Tipping Buckets&lt;br /&gt;
*Replace cable pulls w/ wire...&lt;br /&gt;
*CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
*X-Install Doppler Precip Gauge.&lt;br /&gt;
*X-Replace soil moisture probes.&lt;br /&gt;
*X-Reinstall LiDAR&lt;br /&gt;
*X-Check depth pingers&lt;br /&gt;
*X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
*X-Update Camera SiteTour.&lt;br /&gt;
*X-re-roll DTS fiber cable and stash on ladder.&lt;br /&gt;
*X-grid the ground layer of DTS fiber cable.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
*Pull out big lysimeter and drain box.&lt;br /&gt;
*Decommission MUX1&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
*X-Remove old shadow-band.&lt;br /&gt;
*X-Pull out Johnson snow pillow&lt;br /&gt;
*X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
*Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
*Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
*Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
*Paint.&lt;br /&gt;
*Numbers on I-Beam&lt;br /&gt;
*Resolve Alex wiki passwd issue.&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
*X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=152</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=152"/>
		<updated>2011-09-22T16:20:48Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Sensors: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
*What's up w/ the fiber cable spool?&lt;br /&gt;
**Pull from site, store at Dozier's.&lt;br /&gt;
*How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
*Wire for cable pulls.&lt;br /&gt;
**Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
*Roll or two of E-Tape.&lt;br /&gt;
*Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
*X-Sawzall blades.&lt;br /&gt;
*X-Dykes.&lt;br /&gt;
*X-Fine tip sharpies.&lt;br /&gt;
*X-Silver Sharpie.&lt;br /&gt;
*X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
*X-Swap wire wheels for paint cleanup.&lt;br /&gt;
*X-Number stencils and black spray paint.&lt;br /&gt;
*X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
*Temperature Probe into LiDAR enclosure.&lt;br /&gt;
*Replace radiometers.&lt;br /&gt;
*Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
**Recable.&lt;br /&gt;
*Calibrate Tipping Buckets&lt;br /&gt;
*Replace cable pulls w/ wire...&lt;br /&gt;
*CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
*X-Install Doppler Precip Gauge.&lt;br /&gt;
*X-Replace soil moisture probes.&lt;br /&gt;
*X-Reinstall LiDAR&lt;br /&gt;
*X-Check depth pingers&lt;br /&gt;
*X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
*X-Update Camera SiteTour.&lt;br /&gt;
*X-re-roll DTS fiber cable and stash on ladder.&lt;br /&gt;
*X-grid the ground layer of DTS fiber cable.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
*Pull out big lysimeter and drain box.&lt;br /&gt;
*Decommission MUX1&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
*X-Remove old shadow-band.&lt;br /&gt;
*X-Pull out Johnson snow pillow&lt;br /&gt;
*X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
*Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
*Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
*Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
*Paint.&lt;br /&gt;
*Numbers on I-Beam&lt;br /&gt;
*Resolve Alex wiki passwd issue.&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
*X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=151</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=151"/>
		<updated>2011-09-22T16:19:46Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* 2011 ToDo Items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
*What's up w/ the fiber cable spool?&lt;br /&gt;
**Pull from site, store at Dozier's.&lt;br /&gt;
*How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
*Wire for cable pulls.&lt;br /&gt;
**Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
*Roll or two of E-Tape.&lt;br /&gt;
*Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
*X-Sawzall blades.&lt;br /&gt;
*X-Dykes.&lt;br /&gt;
*X-Fine tip sharpies.&lt;br /&gt;
*X-Silver Sharpie.&lt;br /&gt;
*X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
*X-Swap wire wheels for paint cleanup.&lt;br /&gt;
*X-Number stencils and black spray paint.&lt;br /&gt;
*X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
*Temperature Probe into LiDAR enclosure.&lt;br /&gt;
*Replace radiometers.&lt;br /&gt;
*Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
**Recable.&lt;br /&gt;
*Calibrate Tipping Buckets&lt;br /&gt;
*Replace cable pulls w/ wire...&lt;br /&gt;
*CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
*X-Install Doppler Precip Gauge.&lt;br /&gt;
*X-Replace soil moisture probes.&lt;br /&gt;
*X-Reinstall LiDAR&lt;br /&gt;
*X-Check depth pingers&lt;br /&gt;
*X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
*X-Update Camera SiteTour.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
*Pull out big lysimeter and drain box.&lt;br /&gt;
*Decommission MUX1&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
*X-Remove old shadow-band.&lt;br /&gt;
*X-Pull out Johnson snow pillow&lt;br /&gt;
*X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
*Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
*Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
*Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
*Paint.&lt;br /&gt;
*Numbers on I-Beam&lt;br /&gt;
*Resolve Alex wiki passwd issue.&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
*X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=150</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=150"/>
		<updated>2011-09-22T16:19:06Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Shopping List: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
*What's up w/ the fiber cable spool?&lt;br /&gt;
**Pull from site, store at Dozier's.&lt;br /&gt;
*How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
*Wire for cable pulls.&lt;br /&gt;
**Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
*Roll or two of E-Tape.&lt;br /&gt;
*Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
*X-Sawzall blades.&lt;br /&gt;
*X-Dykes.&lt;br /&gt;
*X-Fine tip sharpies.&lt;br /&gt;
*X-Silver Sharpie.&lt;br /&gt;
*X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
*X-Swap wire wheels for paint cleanup.&lt;br /&gt;
*X-Number stencils and black spray paint.&lt;br /&gt;
*X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
**X-Install Doppler Precip Gauge.&lt;br /&gt;
**X-Replace soil moisture probes.&lt;br /&gt;
**X-Reinstall LiDAR&lt;br /&gt;
**X-Check depth pingers&lt;br /&gt;
**X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**X-Update Camera SiteTour.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=149</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=149"/>
		<updated>2011-09-22T16:18:45Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Questions: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
*What's up w/ the fiber cable spool?&lt;br /&gt;
**Pull from site, store at Dozier's.&lt;br /&gt;
*How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
**Wire for cable pulls.&lt;br /&gt;
***Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
**Roll or two of E-Tape.&lt;br /&gt;
**Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
**X-Sawzall blades.&lt;br /&gt;
**X-Dykes.&lt;br /&gt;
**X-Fine tip sharpies.&lt;br /&gt;
**X-Silver Sharpie.&lt;br /&gt;
**X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
**X-Swap wire wheels for paint cleanup.&lt;br /&gt;
**X-Number stencils and black spray paint.&lt;br /&gt;
**X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
**X-Install Doppler Precip Gauge.&lt;br /&gt;
**X-Replace soil moisture probes.&lt;br /&gt;
**X-Reinstall LiDAR&lt;br /&gt;
**X-Check depth pingers&lt;br /&gt;
**X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**X-Update Camera SiteTour.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=148</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=148"/>
		<updated>2011-09-22T16:18:22Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Questions: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
**What's up w/ the fiber cable spool?&lt;br /&gt;
***Pull from site, store at Dozier's.&lt;br /&gt;
**How tuff to relocate the vertical DTS temp probe?&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
**Wire for cable pulls.&lt;br /&gt;
***Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
**Roll or two of E-Tape.&lt;br /&gt;
**Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
**X-Sawzall blades.&lt;br /&gt;
**X-Dykes.&lt;br /&gt;
**X-Fine tip sharpies.&lt;br /&gt;
**X-Silver Sharpie.&lt;br /&gt;
**X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
**X-Swap wire wheels for paint cleanup.&lt;br /&gt;
**X-Number stencils and black spray paint.&lt;br /&gt;
**X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
**X-Install Doppler Precip Gauge.&lt;br /&gt;
**X-Replace soil moisture probes.&lt;br /&gt;
**X-Reinstall LiDAR&lt;br /&gt;
**X-Check depth pingers&lt;br /&gt;
**X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**X-Update Camera SiteTour.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=147</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=147"/>
		<updated>2011-09-22T16:17:17Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Sensors: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
**What's up w/ the fiber cable spool?&lt;br /&gt;
**Does the fiber cable on the ground need picking up/documenting?&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
**Wire for cable pulls.&lt;br /&gt;
***Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
**Roll or two of E-Tape.&lt;br /&gt;
**Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
**X-Sawzall blades.&lt;br /&gt;
**X-Dykes.&lt;br /&gt;
**X-Fine tip sharpies.&lt;br /&gt;
**X-Silver Sharpie.&lt;br /&gt;
**X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
**X-Swap wire wheels for paint cleanup.&lt;br /&gt;
**X-Number stencils and black spray paint.&lt;br /&gt;
**X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
&lt;br /&gt;
**X-Install Doppler Precip Gauge.&lt;br /&gt;
**X-Replace soil moisture probes.&lt;br /&gt;
**X-Reinstall LiDAR&lt;br /&gt;
**X-Check depth pingers&lt;br /&gt;
**X-Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**X-Update Camera SiteTour.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=146</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=146"/>
		<updated>2011-09-21T15:44:24Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Sensors: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
**What's up w/ the fiber cable spool?&lt;br /&gt;
**Does the fiber cable on the ground need picking up/documenting?&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
**Wire for cable pulls.&lt;br /&gt;
***Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
**Roll or two of E-Tape.&lt;br /&gt;
**Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
**X-Sawzall blades.&lt;br /&gt;
**X-Dykes.&lt;br /&gt;
**X-Fine tip sharpies.&lt;br /&gt;
**X-Silver Sharpie.&lt;br /&gt;
**X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
**X-Swap wire wheels for paint cleanup.&lt;br /&gt;
**X-Number stencils and black spray paint.&lt;br /&gt;
**X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
**Replace soil moisture probes.&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Reinstall LiDAR&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Check depth pingers&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
**Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**CCClone Drive.&lt;br /&gt;
&lt;br /&gt;
**X-Install Doppler Precip Gauge.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=145</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=145"/>
		<updated>2011-09-21T15:43:40Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Shopping List: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
**What's up w/ the fiber cable spool?&lt;br /&gt;
**Does the fiber cable on the ground need picking up/documenting?&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
**Wire for cable pulls.&lt;br /&gt;
***Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
**Roll or two of E-Tape.&lt;br /&gt;
**Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
**X-Sawzall blades.&lt;br /&gt;
**X-Dykes.&lt;br /&gt;
**X-Fine tip sharpies.&lt;br /&gt;
**X-Silver Sharpie.&lt;br /&gt;
**X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
**X-Swap wire wheels for paint cleanup.&lt;br /&gt;
**X-Number stencils and black spray paint.&lt;br /&gt;
**X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
**Replace soil moisture probes.&lt;br /&gt;
**Install Doppler Precip Gauge.&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Reinstall LiDAR&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Check depth pingers&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
**Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**CCClone Drive.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=144</id>
		<title>TLC-2011</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2011&amp;diff=144"/>
		<updated>2011-09-21T15:43:20Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Shopping List: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==2011 ToDo Items==&lt;br /&gt;
&lt;br /&gt;
===Questions:===&lt;br /&gt;
**What's up w/ the fiber cable spool?&lt;br /&gt;
**Does the fiber cable on the ground need picking up/documenting?&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Shopping List:===&lt;br /&gt;
**Wire for cable pulls.&lt;br /&gt;
***Get dimensions. 140' plus ferrals and crimpers.&lt;br /&gt;
&lt;br /&gt;
**Roll or two of E-Tape.&lt;br /&gt;
&lt;br /&gt;
**Industrial Strength Twist Ties.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
**X-Sawzall blades.&lt;br /&gt;
**X-Dykes.&lt;br /&gt;
**X-Fine tip sharpies.&lt;br /&gt;
**X-Silver Sharpie.&lt;br /&gt;
**X-Shelving: 17&amp;quot;x 4-6'&lt;br /&gt;
**X-Swap wire wheels for paint cleanup.&lt;br /&gt;
**X-Number stencils and black spray paint.&lt;br /&gt;
**X-5&amp;quot; posts for SPN1&lt;br /&gt;
&lt;br /&gt;
===Sensors:===&lt;br /&gt;
**Replace soil moisture probes.&lt;br /&gt;
**Install Doppler Precip Gauge.&lt;br /&gt;
**Temperature Probe into LiDAR enclosure.&lt;br /&gt;
**Reinstall LiDAR&lt;br /&gt;
**Replace radiometers.&lt;br /&gt;
**Relocate SPN1 Sunshine pyronometer.&lt;br /&gt;
***Recable.&lt;br /&gt;
**Check depth pingers&lt;br /&gt;
**Calibrate Tipping Buckets&lt;br /&gt;
**Replace cable pulls w/ wire...&lt;br /&gt;
**CCClone Mac.&lt;br /&gt;
**Re-enter waypoints into GUI interface of camera.&lt;br /&gt;
**CCClone Drive.&lt;br /&gt;
&lt;br /&gt;
===Demo:===&lt;br /&gt;
**Pull out big lysimeter and drain box.&lt;br /&gt;
**Decommission MUX1&lt;br /&gt;
&lt;br /&gt;
**X-Pull Macalu receiver.&lt;br /&gt;
**X-Remove old shadow-band.&lt;br /&gt;
**X-Pull out Johnson snow pillow&lt;br /&gt;
**X-Pull out mini snow pillow below Boom Pinger.&lt;br /&gt;
&lt;br /&gt;
===Fabrication:===&lt;br /&gt;
**Frank Gherke Snow Pillow?  ...or two?&lt;br /&gt;
**Shelf for Aethalometer next to phone on W wall.&lt;br /&gt;
**Mount LiDAR power boxes left of incoming fiber on S Wall.&lt;br /&gt;
**Paint.&lt;br /&gt;
**Numbers on I-Beam&lt;br /&gt;
**Resolve Alex wiki passwd issue.&lt;br /&gt;
&lt;br /&gt;
**X-Plumb Chimney Drain.&lt;br /&gt;
**X-One more bamboo hole west of platform.&lt;br /&gt;
&lt;br /&gt;
==Post 2010 Notes:==&lt;br /&gt;
&lt;br /&gt;
Heated Sonic Anemometer: $5500&lt;br /&gt;
*Aiming at winter 2011 installation, waiting for budget stuff before purchase.&lt;br /&gt;
&lt;br /&gt;
Precip Guage (Bert has no faith so unless it's free, bail on this):&lt;br /&gt;
*Folks at Mt. Washington have [http://www.geonor.com/precipitation_gauge.html something] that werks, Kerry looking into wind shield and pricing.&lt;br /&gt;
*Jesse also had this to add:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
re:on Precip gauges:&lt;br /&gt;
&lt;br /&gt;
http://www.logotronic.at/en/produkte/sensoren-fuer-die-meteorologie/niederschlagschneehoehe/122-160.htm&lt;br /&gt;
http://www.fondriest.com/products/hydreon_rg-11.htm&lt;br /&gt;
http://www.skypowerinternational.com/shopcart/productlayouts/ProductsList.asp&lt;br /&gt;
&lt;br /&gt;
And the one I was really in favor of trying a couple years ago...&lt;br /&gt;
&lt;br /&gt;
http://www.thiesclima.com/disdrometer.html&lt;br /&gt;
&lt;br /&gt;
Pulling the Dynamax soil moisture probes is a really really good idea for re-cal / check out.&lt;br /&gt;
Just wanted to remind all that the sleeves were not used due to the dryness of the soil normally, Mike McClung of Dynamax recommended not using them for this application when we installed them originally.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Soil Moisture Probes:&lt;br /&gt;
*Need overhaul and re-installation w/ tubes.&lt;br /&gt;
*Also these [http://www.decagon.com/products/sensors/soil-moisture-sensors/ units] for less than $150 each that both Jesse and Kerry recommend.&lt;br /&gt;
&lt;br /&gt;
Snow Pillow: $10K&lt;br /&gt;
*Bert saw something that looked reasonable at AGU&lt;br /&gt;
*Jerry Johnson has his setup.&lt;br /&gt;
&lt;br /&gt;
Overhaul tipping bucket mounts.&lt;br /&gt;
&lt;br /&gt;
==Chores:==&lt;br /&gt;
*Paint remote boom and re-do depth markings so we can see them from the camera.&lt;br /&gt;
*Reinstall soil moisture probes.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=141</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=141"/>
		<updated>2011-09-20T22:59:02Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Networks */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh cues@192.168.0.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Data Loggers:&lt;br /&gt;
*CR3000-1: IP: 192.168.0.101&lt;br /&gt;
*CR3000-2: IP: 192.168.0.102&lt;br /&gt;
*CR3000-3: IP: 192.168.0.103&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.???&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=140</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=140"/>
		<updated>2011-09-20T22:56:23Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Power Cycling the LiDAR remotely */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh cues@192.168.0.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.???&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=139</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=139"/>
		<updated>2011-09-20T22:47:42Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Networks */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh cues@10.1.1.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR &lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA ResNet):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES Pre-20110920 private subnet):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (CUES Mac on Private subnet):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.???&lt;br /&gt;
&lt;br /&gt;
LiDAR IP-Power Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]:&lt;br /&gt;
*IP: 192.168.0.254&lt;br /&gt;
&lt;br /&gt;
Camera: &lt;br /&gt;
*IP: 192.168.0.90&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=121</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=121"/>
		<updated>2011-06-30T15:54:11Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Networks */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==LiDAR==&lt;br /&gt;
===Power Cycling the LiDAR remotely===&lt;br /&gt;
*Get onto the CUES system at the site (SHOULD work from either the Mac or Win system)&lt;br /&gt;
*Open up a cygwin or command terminal.&lt;br /&gt;
*ssh cues@10.1.1.254&lt;br /&gt;
**standard passwd you should all know.&lt;br /&gt;
**It'll take a short while to login and then give you a &amp;quot;Sentry&amp;quot; prompt.&lt;br /&gt;
*off&lt;br /&gt;
*LiDAR&lt;br /&gt;
*wait 5 seconds or humm the Jeapordy Tune.&lt;br /&gt;
*on&lt;br /&gt;
*LiDAR &lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (LiDAR):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]: &lt;br /&gt;
*IP 10.1.1.254&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.???&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=120</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=120"/>
		<updated>2011-05-12T00:18:45Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Networks */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (LiDAR):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Switched CDU [http://www.servertech.com/products/switched-pdus/switched-pdu-cw-2h-ipm-2 Manual]: &lt;br /&gt;
*IP 10.1.1.254&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.???&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=119</id>
		<title>Site Computer</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=Site_Computer&amp;diff=119"/>
		<updated>2011-05-11T21:36:59Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* Networks */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;System name is CUES-Mini, it's at 192.168.220.251 on the MMSA Employee Net and at 72.67.190.65 from anywhere.  SSH is the only port forwarded to the system from the outside.&lt;br /&gt;
&lt;br /&gt;
==TeamViewer==&lt;br /&gt;
CUES-Win: 165 385 363&lt;br /&gt;
&lt;br /&gt;
CUES-Mac: 173 704 513&lt;br /&gt;
&lt;br /&gt;
==VNC over SSH==&lt;br /&gt;
Getting onto the system from the outside:&lt;br /&gt;
&lt;br /&gt;
I've got the site system accepting VNC connections via an SSH tunnel.  Here's a good [http://fotinakis.com/blog/blog/2008/secure-mac-screen-sharing/ VNC over SSH HowTo].&lt;br /&gt;
&lt;br /&gt;
That's designed for the Mac but you'll get the idea.  Username is &amp;quot;cues&amp;quot;.&lt;br /&gt;
&lt;br /&gt;
The key bit is the login tunnel:&lt;br /&gt;
&lt;br /&gt;
 ssh cues@72.67.190.65 -L 5900:localhost:5900&lt;br /&gt;
&lt;br /&gt;
Then, on the Mac anyhow, you'll fire up a VNC session (Command-K from the Finder) and enter:&lt;br /&gt;
&lt;br /&gt;
 vnc://localhost:0&lt;br /&gt;
&lt;br /&gt;
==Networks==&lt;br /&gt;
&lt;br /&gt;
en0 (MMSA):&lt;br /&gt;
192.168.220.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
192.168.220.1&lt;br /&gt;
SME&lt;br /&gt;
&lt;br /&gt;
en2 (CUES):&lt;br /&gt;
10.1.1.251&lt;br /&gt;
255.255.255.0&lt;br /&gt;
10.1.1.1&lt;br /&gt;
&lt;br /&gt;
en3 (LiDAR):&lt;br /&gt;
192.168.0.251&lt;br /&gt;
&lt;br /&gt;
Switched CDU: &lt;br /&gt;
*IP 10.1.1.254&lt;br /&gt;
&lt;br /&gt;
LiDAR: &lt;br /&gt;
*IP 192.168.0.???&lt;br /&gt;
&lt;br /&gt;
==Backups==&lt;br /&gt;
System is running TimeMachine onto &amp;quot;CUES-TimeMachine&amp;quot; drive which is a 160GB laptop drive plugged in via USB.  The VMware Fusion system is set to take Auto-SnapShots in order to keep from having to backup the entire VM every TimeMachine instance as explained [http://jasonnash.wordpress.com/2009/07/22/protecting-your-vmware-fusion-vms-with-time-machine/ here].&lt;br /&gt;
&lt;br /&gt;
Colee is also keeping a CCCloner copy of the system at UCSB.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2010&amp;diff=105</id>
		<title>TLC-2010</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2010&amp;diff=105"/>
		<updated>2010-08-25T23:30:42Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* 20100817-Shopping List and TODO items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Shipping:&lt;br /&gt;
   Michael Colee C/O SNARL&lt;br /&gt;
   1016 Mt. Morrison Road&lt;br /&gt;
   Mammoth Lakes, CA 93546&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Schedules: ==&lt;br /&gt;
&lt;br /&gt;
LiDAR: Dave had weather issues on an earlier trip so has to head up to Alaska next week.  He and I are hoping to converge at the site for installation of the automated LiDAR sometime between Sept 17th-22nd.&lt;br /&gt;
&lt;br /&gt;
Kerry: flight delayed: arriving in Mammoth ~noon of Aug 17th, available thru 26th+ staying at the Shilo Inn.&lt;br /&gt;
&lt;br /&gt;
Alex: available Aug 16th thru 25th, absent 20100821-1500 thru 20100823-????.&lt;br /&gt;
&lt;br /&gt;
Bert: arriving UCSB for meetings/logistics Aug 14-17, Mammoth 18-21.&lt;br /&gt;
&lt;br /&gt;
Dozier: @UCSB Aug16-18, Mammoth 18-25+&lt;br /&gt;
&lt;br /&gt;
Colee: @UCSB Aug10-&amp;gt;16th, Mammoth 17th-26th.&lt;br /&gt;
&lt;br /&gt;
Stuart Wilkinson (USGS Seismology stuff): Aug 18th or 19th.  To make their eqpt more permanent.&lt;br /&gt;
*Met w/ Stuart on the 19th, they're gonna try to anchor their seismometers in bedrock near iBeam and run cabling in thru former gamma sensor tube to bunker.&lt;br /&gt;
*Will discuss technical issues w/ his tech early week of 20100823.&lt;br /&gt;
&lt;br /&gt;
==20100817-Shopping List and TODO items==&lt;br /&gt;
*4 @ 10&amp;quot;x78&amp;quot; lysimeter walls&lt;br /&gt;
*3/8&amp;quot; socket drive.&lt;br /&gt;
*Vice&lt;br /&gt;
*Dry Lube for lock.&lt;br /&gt;
*MicroFiber screen/dome cleaning cloth (Apple unit from office).&lt;br /&gt;
*Shop towels.&lt;br /&gt;
*Long Philips screwdriver&lt;br /&gt;
*Ratcheting screwdriver w/ bits.&lt;br /&gt;
*6 clear storage containers to organize parts etc.&lt;br /&gt;
*Black Sharpies&lt;br /&gt;
*Industrial Twist Ties&lt;br /&gt;
**http://www.twistems.com/pages/industrial.html&lt;br /&gt;
**http://www.uline.com/BL_3153/Plastic-Colored-Twist-Ties-Spools&lt;br /&gt;
**http://www.andfel.com/1500-feet-spooled-plastic-ties-p-228-l-en.html&lt;br /&gt;
**http://www.terrebonnelimited.com/index.php?crn=216&amp;amp;rn=919&amp;amp;action=show_detail&lt;br /&gt;
**http://www.wormsway.com/detail.aspx?sku=STT310&amp;amp;AC=1&lt;br /&gt;
**http://www.amazon.com/Luster-Leaf-Rapiclip-Light-839/dp/B000RUFDI2/ref=pd_sim_ol_1&lt;br /&gt;
**http://www.tach-it.com/Twist-Tie-Materials/twist-tie-machine-polycore/1&lt;br /&gt;
*Yogurt container&lt;br /&gt;
&lt;br /&gt;
Group Questions:&lt;br /&gt;
*Location of Sonic Anemometers:&lt;br /&gt;
**One on Boom, one at current location, one RMYoung vain near windmast.&lt;br /&gt;
**We will use depth pingers to spit out depth of snow and height of center of anemometers above surface.&lt;br /&gt;
*Wind project, chair anemometers are oriented all wonky, we'll need to sync up and probably enter adjustments on input.&lt;br /&gt;
&lt;br /&gt;
*Lidar: would like 10cm or better accuracy.&lt;br /&gt;
&lt;br /&gt;
Misc Notes:&lt;br /&gt;
*Play w/ linksys network and see if it can easily get to the site computer.&lt;br /&gt;
*Field notes in Wiki... migrate appropriately from there:&lt;br /&gt;
**Daily Journal/Site Visit Log&lt;br /&gt;
**Data issues/notes/flags&lt;br /&gt;
**Instrument metadata&lt;br /&gt;
&lt;br /&gt;
*Repair big lisymeter: 25cm x 200cm(id) walls.&lt;br /&gt;
*Ned: Thermisters at Patrol site?  Abandon?&lt;br /&gt;
*Snow Pillow: Nope.&lt;br /&gt;
*Precip guage: Nope.&lt;br /&gt;
*Heated sonic anemometer: Yes, scoping prices etc.&lt;br /&gt;
*Ski-Pole TempProbe?&lt;br /&gt;
**Bert: Thermisters or Thermocouples, what type.&lt;br /&gt;
**20100821: Emailed Jesse asking location of probe.&lt;br /&gt;
**20100823: Jesse found it, waiting for Kerry at CRREL.&lt;br /&gt;
&lt;br /&gt;
*Up/Down KIPs for radiometers: Later.&lt;br /&gt;
*Long term NIR radiometer solution from (Alex has bookmark somewhere): Start researching for 2011 installation.&lt;br /&gt;
*Soil moisture tube issue&lt;br /&gt;
**South instrument is wonky, planning on fixing both w/ tubes.&lt;br /&gt;
*Questions on how we want sonic anemometer data collected (sample rate).&lt;br /&gt;
**20100823: Kerry/Dozier working this out w/ Ed from NWAR(?).&lt;br /&gt;
&lt;br /&gt;
Sept 2010 Trip:&lt;br /&gt;
*What power do we need for LIDAR&lt;br /&gt;
*Need RJ45 connectors and crimper&lt;br /&gt;
&lt;br /&gt;
Follow up stuff:&lt;br /&gt;
*Kerry to ship NIR domes/sensor.&lt;br /&gt;
&lt;br /&gt;
==Goals:==&lt;br /&gt;
===Fiber===&lt;br /&gt;
*Cleaned up and looking into disposal options&lt;br /&gt;
*Dozier to purchase white and redeploy in grid at site w/ landmarks.&lt;br /&gt;
&lt;br /&gt;
===$$Connectors: Kerry/Alex:===&lt;br /&gt;
* Found old crimpers, just need more fittings and insertion/extraction tools.&lt;br /&gt;
&lt;br /&gt;
===$$Muxers: Kerry: ===&lt;br /&gt;
*Research and order 1/2 solid state muxers.&lt;br /&gt;
*Migrated stuff from MUX1 to logger instead.&lt;br /&gt;
&lt;br /&gt;
===Thermisters===&lt;br /&gt;
*Calibrated CUES units:&lt;br /&gt;
**Immersed all 8 in a water bucket on 20100822-1337: &lt;br /&gt;
{| style='padding: 0; color: #444; border: grey solid 1px;'  border='1'&lt;br /&gt;
|-&lt;br /&gt;
!Thermister!!deg C@20100822-1338!!deg C@20100822-1&lt;br /&gt;
|-&lt;br /&gt;
|1||13.59||13.56&lt;br /&gt;
|-&lt;br /&gt;
|2||13.62||13.57&lt;br /&gt;
|-&lt;br /&gt;
|3||13.65||13.57&lt;br /&gt;
|-&lt;br /&gt;
|4||13.59||13.54&lt;br /&gt;
|-&lt;br /&gt;
|5||13.58||13.51&lt;br /&gt;
|-&lt;br /&gt;
|6||13.76||13.73&lt;br /&gt;
|-&lt;br /&gt;
|7||13.16||13.12&lt;br /&gt;
|-&lt;br /&gt;
|8||13.61||13.57&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
*Long term plans for Sesame units?  Up to Ned.&lt;br /&gt;
&lt;br /&gt;
===Depth pingers: Kerry/Alex/MTC.===&lt;br /&gt;
*Replace and test w/ newly calibrated pingers.&lt;br /&gt;
**Done.  Mast pinger is now retired along w/ the mast.&lt;br /&gt;
*Installing Campbell (SR50) under non-heated sonic anemometer.&lt;br /&gt;
&lt;br /&gt;
===Lysimeters: MTC/Alex: ===&lt;br /&gt;
*Repair big one, 4 walls at 10&amp;quot;x78&amp;quot;x1/2&amp;quot;&lt;br /&gt;
*Repaired other one w/ clear materials from SNARL.&lt;br /&gt;
&lt;br /&gt;
===Chimney Drip: MTC/Alex:===&lt;br /&gt;
*Installed gutter, need to fabricate/install drain.&lt;br /&gt;
&lt;br /&gt;
*Chimney drain:&lt;br /&gt;
**2&amp;quot; 8-10&amp;quot; long w/ 1/2&amp;quot; 5&amp;quot; deep slit to surround chimney wall.&lt;br /&gt;
**need 1 x 2&amp;quot; to 3/4&amp;quot; reducer.&lt;br /&gt;
**need 4 x 3/4&amp;quot; 45's&lt;br /&gt;
&lt;br /&gt;
===Tipping buckets: MTC:===&lt;br /&gt;
*Test switches and scope drains and plan overhaul of tipping bucket mounts for 2011.&lt;br /&gt;
**Done, 9 (big one) appears to have switch issues.&lt;br /&gt;
&lt;br /&gt;
Plumbing: &lt;br /&gt;
*Big Lysimeter drain plumbing:&lt;br /&gt;
**1.5&amp;quot; tubing, have plenty of it at site.&lt;br /&gt;
**Hacksaw a groove in primary drain tube to accommodate heat tape.&lt;br /&gt;
**Need 1 @ 1.5&amp;quot; 90&lt;br /&gt;
**Need 1 @ 1.5&amp;quot; 45&lt;br /&gt;
**Have 1.5&amp;quot; to 1/2&amp;quot; reducer.  ? Reduce to 3/4&amp;quot; instead?&lt;br /&gt;
&lt;br /&gt;
*Inventory:&lt;br /&gt;
**Lots of 3/4&amp;quot; PVC&lt;br /&gt;
**Lots of 2&amp;quot; PVC&lt;br /&gt;
**Clear tubing is 3/4&amp;quot; id and 1&amp;quot; od, slightly more than 6'.&lt;br /&gt;
&lt;br /&gt;
===Anemometers: Kerry/Alex, w/ input from gang:===&lt;br /&gt;
*Kerry is researching and will hopefully implement a heated sonic this fall/winter.&lt;br /&gt;
*Kerry has fixed the current unheated sonic (RM Young 3D 81000). &lt;br /&gt;
*Wind mast has been removed.&lt;br /&gt;
*One prop_vain anemometer from the mast has been installed near the former top mast anemometer.&lt;br /&gt;
**This will need a pin or something to keep it from spinning in its mounts.&lt;br /&gt;
&lt;br /&gt;
===Loggers===&lt;br /&gt;
*UPload progams to wiki and backload as many as possible.&lt;br /&gt;
*Scope programming and clean it up.&lt;br /&gt;
*All the same, and all have 2GB.&lt;br /&gt;
**Calculate time till over-run.&lt;br /&gt;
***?? days on CR3K#1&lt;br /&gt;
***?? days on CR3K#2&lt;br /&gt;
***188 days on CR3K#3&lt;br /&gt;
**Confirm overwrite is turned on.&lt;br /&gt;
&lt;br /&gt;
===Camera: MTC===&lt;br /&gt;
*Wrote and implemented a SiteTour script, running hourly.&lt;br /&gt;
*Need to figure out zoom function from command line.&lt;br /&gt;
**20100822: Wrote to Axis for support.&lt;br /&gt;
**20100823: got references in response, looks like it's doable, research/implement.&lt;br /&gt;
*Bead of silicone on camera mount.&lt;br /&gt;
*Add closeup of BombBunker into SiteTour&lt;br /&gt;
*20100823: Cleaned camera dome.  Inside was clean, outside only in future.&lt;br /&gt;
&lt;br /&gt;
===Moisture Probes:===&lt;br /&gt;
*Investigating repair of southern probe, northern probe appears fine. &lt;br /&gt;
&lt;br /&gt;
===Temperature Probe:===&lt;br /&gt;
*Scope data and research TLC needs.&lt;br /&gt;
**20100822: data appears good, values seem off (~200)&lt;br /&gt;
&lt;br /&gt;
===$$Power: Kerry/Alex/MTC===&lt;br /&gt;
*Need new Marine Deep Cycle solution... &lt;br /&gt;
** or migrate to a 12-15v supply.&lt;br /&gt;
*Test UPS for computer.&lt;br /&gt;
**Tested and seems fine.&lt;br /&gt;
&lt;br /&gt;
===Radiometers: Kerry/Alex:===&lt;br /&gt;
*Replace downlooking radiometers w/ calibrated units.&lt;br /&gt;
**Done.&lt;br /&gt;
*Longwave programming.&lt;br /&gt;
**Done.&lt;br /&gt;
*New shadow band appears to be performing well.&lt;br /&gt;
**Scope power alternatives for heater power supply.&lt;br /&gt;
***12-15V power supply on line power?&lt;br /&gt;
**Continue to run manual till we iron out differences in readings.&lt;br /&gt;
**Calibration every 2 years, plan for 2011 session.  Do we need a second for leapfrogging?&lt;br /&gt;
*NIR radiometers: red domes are close to impossible to obtain, we'll probably squeak by another year or two on what we've got but we need to investigate long term solutions.  Alex has done good ground work on this.&lt;br /&gt;
**Alex's notes on net radiometers:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
It looks like the integrated net radiometers are starting to get popular.  &lt;br /&gt;
Campbell just announced the release of a new one which looks like a really &lt;br /&gt;
slick design and has better specs than the other set we were looking at:  &lt;br /&gt;
http://www.campbellsci.com/cnr4&lt;br /&gt;
&lt;br /&gt;
CNR4-L 26003- Kipp &amp;amp; Zonen 4-Component Net Radiation Sensor $6,400.00&lt;br /&gt;
26120 26120 Net Radiation Sensor Mounting Kit  $145.00&lt;br /&gt;
CNF4-L 26008- Kipp &amp;amp; Zonen Ventilation Unit w/Heater $1,600.00&lt;br /&gt;
&lt;br /&gt;
They've also got something for $4350 they're calling the NR01, manufactured &lt;br /&gt;
by Hukseflux, which appears to be the same instrument as the Dynamax SN01: &lt;br /&gt;
http://www.campbellsci.com/nr01&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===$$Perimeter Poles: Ned/Alex:===&lt;br /&gt;
*Ned to investigate permit/pounder/materials to implement 4&amp;quot;OD, 6' long poles.&lt;br /&gt;
*Scoping plates w/ couplers/poles welded.  2' plate, 4-6' poles w/ 3-4&amp;quot; OD.&lt;br /&gt;
*20100825: planning on galvanized pipe flange mounted to sheet metal or something w/ a 6-10&amp;quot; 2-3&amp;quot; galvanized nipple which we can drop PVC or galvanized pipe into to be removed when the snow is deep enuf to support bamboo.&lt;br /&gt;
&lt;br /&gt;
===$$Paint: MTC/Ned/Alex:===&lt;br /&gt;
*Scraper&lt;br /&gt;
*Brush it on thick and simple.&lt;br /&gt;
&lt;br /&gt;
===$$Snow Pillow:===&lt;br /&gt;
* nothing happening currently but still on the long-term wish-list.  Previous notes reference a &amp;quot;DRUCK 5 PSI&amp;quot;???&lt;br /&gt;
**Relocate snow pillow from platform to side of big lysimeter on cinder blocks, the lysimeter is too fragile to mount the snow pillow on top of it... tho that would be a cool way to design a new snow pillow/ lysimeter combo device.&lt;br /&gt;
&lt;br /&gt;
===$$Precip Guage?===&lt;br /&gt;
*Laser based unit?&lt;br /&gt;
**Bail, too tuff w/ blowing snow and LiDAR will take care of this to some degree.&lt;br /&gt;
&lt;br /&gt;
===$$MMSA chairlift wind integration:===&lt;br /&gt;
*Chair1 working well, additional updates pending Dallas/Davis/Dozier meeting on Sept 19th.&lt;br /&gt;
**Meeting went well, MMSA moving ahead w/ updates.&lt;br /&gt;
&lt;br /&gt;
===Graphs: Alex/Ned/MTC:===&lt;br /&gt;
*RTMC (comes w/ loggernet) implementation of graphs, similar to [http://patrol.mammothmountain.com Patrol].&lt;br /&gt;
&lt;br /&gt;
===Misc===&lt;br /&gt;
*Integrate data from old wiki into new.&lt;br /&gt;
*Polish up web presence.&lt;br /&gt;
*Design and schedule data Q/A procedure.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
	<entry>
		<id>https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2010&amp;diff=104</id>
		<title>TLC-2010</title>
		<link rel="alternate" type="text/html" href="https://wiki-cues.eri.ucsb.edu/index.php?title=TLC-2010&amp;diff=104"/>
		<updated>2010-08-25T21:58:53Z</updated>

		<summary type="html">&lt;p&gt;Cues: /* 20100817-Shopping List and TODO items */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Shipping:&lt;br /&gt;
   Michael Colee C/O SNARL&lt;br /&gt;
   1016 Mt. Morrison Road&lt;br /&gt;
   Mammoth Lakes, CA 93546&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Schedules: ==&lt;br /&gt;
&lt;br /&gt;
LiDAR: Dave had weather issues on an earlier trip so has to head up to Alaska next week.  He and I are hoping to converge at the site for installation of the automated LiDAR sometime between Sept 17th-22nd.&lt;br /&gt;
&lt;br /&gt;
Kerry: flight delayed: arriving in Mammoth ~noon of Aug 17th, available thru 26th+ staying at the Shilo Inn.&lt;br /&gt;
&lt;br /&gt;
Alex: available Aug 16th thru 25th, absent 20100821-1500 thru 20100823-????.&lt;br /&gt;
&lt;br /&gt;
Bert: arriving UCSB for meetings/logistics Aug 14-17, Mammoth 18-21.&lt;br /&gt;
&lt;br /&gt;
Dozier: @UCSB Aug16-18, Mammoth 18-25+&lt;br /&gt;
&lt;br /&gt;
Colee: @UCSB Aug10-&amp;gt;16th, Mammoth 17th-26th.&lt;br /&gt;
&lt;br /&gt;
Stuart Wilkinson (USGS Seismology stuff): Aug 18th or 19th.  To make their eqpt more permanent.&lt;br /&gt;
*Met w/ Stuart on the 19th, they're gonna try to anchor their seismometers in bedrock near iBeam and run cabling in thru former gamma sensor tube to bunker.&lt;br /&gt;
*Will discuss technical issues w/ his tech early week of 20100823.&lt;br /&gt;
&lt;br /&gt;
==20100817-Shopping List and TODO items==&lt;br /&gt;
*4 @ 10&amp;quot;x78&amp;quot; lysimeter walls&lt;br /&gt;
*3/8&amp;quot; socket drive.&lt;br /&gt;
*Vice&lt;br /&gt;
*Dry Lube for lock.&lt;br /&gt;
*MicroFiber screen/dome cleaning cloth (Apple unit from office).&lt;br /&gt;
*Shop towels.&lt;br /&gt;
*Long Philips screwdriver&lt;br /&gt;
*Ratcheting screwdriver w/ bits.&lt;br /&gt;
*6 clear storage containers to organize parts etc.&lt;br /&gt;
*Black Sharpies&lt;br /&gt;
*Industrial Twist Ties&lt;br /&gt;
*Yogurt container&lt;br /&gt;
&lt;br /&gt;
Group Questions:&lt;br /&gt;
*Location of Sonic Anemometers:&lt;br /&gt;
**One on Boom, one at current location, one RMYoung vain near windmast.&lt;br /&gt;
**We will use depth pingers to spit out depth of snow and height of center of anemometers above surface.&lt;br /&gt;
*Wind project, chair anemometers are oriented all wonky, we'll need to sync up and probably enter adjustments on input.&lt;br /&gt;
&lt;br /&gt;
*Lidar: would like 10cm or better accuracy.&lt;br /&gt;
&lt;br /&gt;
Misc Notes:&lt;br /&gt;
*Play w/ linksys network and see if it can easily get to the site computer.&lt;br /&gt;
*Field notes in Wiki... migrate appropriately from there:&lt;br /&gt;
**Daily Journal/Site Visit Log&lt;br /&gt;
**Data issues/notes/flags&lt;br /&gt;
**Instrument metadata&lt;br /&gt;
&lt;br /&gt;
*Repair big lisymeter: 25cm x 200cm(id) walls.&lt;br /&gt;
*Ned: Thermisters at Patrol site?  Abandon?&lt;br /&gt;
*Snow Pillow: Nope.&lt;br /&gt;
*Precip guage: Nope.&lt;br /&gt;
*Heated sonic anemometer: Yes, scoping prices etc.&lt;br /&gt;
*Ski-Pole TempProbe?&lt;br /&gt;
**Bert: Thermisters or Thermocouples, what type.&lt;br /&gt;
**20100821: Emailed Jesse asking location of probe.&lt;br /&gt;
**20100823: Jesse found it, waiting for Kerry at CRREL.&lt;br /&gt;
&lt;br /&gt;
*Up/Down KIPs for radiometers: Later.&lt;br /&gt;
*Long term NIR radiometer solution from (Alex has bookmark somewhere): Start researching for 2011 installation.&lt;br /&gt;
*Soil moisture tube issue&lt;br /&gt;
**South instrument is wonky, planning on fixing both w/ tubes.&lt;br /&gt;
*Questions on how we want sonic anemometer data collected (sample rate).&lt;br /&gt;
**20100823: Kerry/Dozier working this out w/ Ed from NWAR(?).&lt;br /&gt;
&lt;br /&gt;
Sept 2010 Trip:&lt;br /&gt;
*What power do we need for LIDAR&lt;br /&gt;
*Need RJ45 connectors and crimper&lt;br /&gt;
&lt;br /&gt;
Follow up stuff:&lt;br /&gt;
*Kerry to ship NIR domes/sensor.&lt;br /&gt;
&lt;br /&gt;
==Goals:==&lt;br /&gt;
===Fiber===&lt;br /&gt;
*Cleaned up and looking into disposal options&lt;br /&gt;
*Dozier to purchase white and redeploy in grid at site w/ landmarks.&lt;br /&gt;
&lt;br /&gt;
===$$Connectors: Kerry/Alex:===&lt;br /&gt;
* Found old crimpers, just need more fittings and insertion/extraction tools.&lt;br /&gt;
&lt;br /&gt;
===$$Muxers: Kerry: ===&lt;br /&gt;
*Research and order 1/2 solid state muxers.&lt;br /&gt;
*Migrated stuff from MUX1 to logger instead.&lt;br /&gt;
&lt;br /&gt;
===Thermisters===&lt;br /&gt;
*Calibrated CUES units:&lt;br /&gt;
**Immersed all 8 in a water bucket on 20100822-1337: &lt;br /&gt;
{| style='padding: 0; color: #444; border: grey solid 1px;'  border='1'&lt;br /&gt;
|-&lt;br /&gt;
!Thermister!!deg C@20100822-1338!!deg C@20100822-1&lt;br /&gt;
|-&lt;br /&gt;
|1||13.59||13.56&lt;br /&gt;
|-&lt;br /&gt;
|2||13.62||13.57&lt;br /&gt;
|-&lt;br /&gt;
|3||13.65||13.57&lt;br /&gt;
|-&lt;br /&gt;
|4||13.59||13.54&lt;br /&gt;
|-&lt;br /&gt;
|5||13.58||13.51&lt;br /&gt;
|-&lt;br /&gt;
|6||13.76||13.73&lt;br /&gt;
|-&lt;br /&gt;
|7||13.16||13.12&lt;br /&gt;
|-&lt;br /&gt;
|8||13.61||13.57&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
*Long term plans for Sesame units?  Up to Ned.&lt;br /&gt;
&lt;br /&gt;
===Depth pingers: Kerry/Alex/MTC.===&lt;br /&gt;
*Replace and test w/ newly calibrated pingers.&lt;br /&gt;
**Done.  Mast pinger is now retired along w/ the mast.&lt;br /&gt;
*Installing Campbell (SR50) under non-heated sonic anemometer.&lt;br /&gt;
&lt;br /&gt;
===Lysimeters: MTC/Alex: ===&lt;br /&gt;
*Repair big one, 4 walls at 10&amp;quot;x78&amp;quot;x1/2&amp;quot;&lt;br /&gt;
*Repaired other one w/ clear materials from SNARL.&lt;br /&gt;
&lt;br /&gt;
===Chimney Drip: MTC/Alex:===&lt;br /&gt;
*Installed gutter, need to fabricate/install drain.&lt;br /&gt;
&lt;br /&gt;
*Chimney drain:&lt;br /&gt;
**2&amp;quot; 8-10&amp;quot; long w/ 1/2&amp;quot; 5&amp;quot; deep slit to surround chimney wall.&lt;br /&gt;
**need 1 x 2&amp;quot; to 3/4&amp;quot; reducer.&lt;br /&gt;
**need 4 x 3/4&amp;quot; 45's&lt;br /&gt;
&lt;br /&gt;
===Tipping buckets: MTC:===&lt;br /&gt;
*Test switches and scope drains and plan overhaul of tipping bucket mounts for 2011.&lt;br /&gt;
**Done, 9 (big one) appears to have switch issues.&lt;br /&gt;
&lt;br /&gt;
Plumbing: &lt;br /&gt;
*Big Lysimeter drain plumbing:&lt;br /&gt;
**1.5&amp;quot; tubing, have plenty of it at site.&lt;br /&gt;
**Hacksaw a groove in primary drain tube to accommodate heat tape.&lt;br /&gt;
**Need 1 @ 1.5&amp;quot; 90&lt;br /&gt;
**Need 1 @ 1.5&amp;quot; 45&lt;br /&gt;
**Have 1.5&amp;quot; to 1/2&amp;quot; reducer.  ? Reduce to 3/4&amp;quot; instead?&lt;br /&gt;
&lt;br /&gt;
*Inventory:&lt;br /&gt;
**Lots of 3/4&amp;quot; PVC&lt;br /&gt;
**Lots of 2&amp;quot; PVC&lt;br /&gt;
**Clear tubing is 3/4&amp;quot; id and 1&amp;quot; od, slightly more than 6'.&lt;br /&gt;
&lt;br /&gt;
===Anemometers: Kerry/Alex, w/ input from gang:===&lt;br /&gt;
*Kerry is researching and will hopefully implement a heated sonic this fall/winter.&lt;br /&gt;
*Kerry has fixed the current unheated sonic (RM Young 3D 81000). &lt;br /&gt;
*Wind mast has been removed.&lt;br /&gt;
*One prop_vain anemometer from the mast has been installed near the former top mast anemometer.&lt;br /&gt;
**This will need a pin or something to keep it from spinning in its mounts.&lt;br /&gt;
&lt;br /&gt;
===Loggers===&lt;br /&gt;
*UPload progams to wiki and backload as many as possible.&lt;br /&gt;
*Scope programming and clean it up.&lt;br /&gt;
*All the same, and all have 2GB.&lt;br /&gt;
**Calculate time till over-run.&lt;br /&gt;
***?? days on CR3K#1&lt;br /&gt;
***?? days on CR3K#2&lt;br /&gt;
***188 days on CR3K#3&lt;br /&gt;
**Confirm overwrite is turned on.&lt;br /&gt;
&lt;br /&gt;
===Camera: MTC===&lt;br /&gt;
*Wrote and implemented a SiteTour script, running hourly.&lt;br /&gt;
*Need to figure out zoom function from command line.&lt;br /&gt;
**20100822: Wrote to Axis for support.&lt;br /&gt;
**20100823: got references in response, looks like it's doable, research/implement.&lt;br /&gt;
*Bead of silicone on camera mount.&lt;br /&gt;
*Add closeup of BombBunker into SiteTour&lt;br /&gt;
*20100823: Cleaned camera dome.  Inside was clean, outside only in future.&lt;br /&gt;
&lt;br /&gt;
===Moisture Probes:===&lt;br /&gt;
*Investigating repair of southern probe, northern probe appears fine. &lt;br /&gt;
&lt;br /&gt;
===Temperature Probe:===&lt;br /&gt;
*Scope data and research TLC needs.&lt;br /&gt;
**20100822: data appears good, values seem off (~200)&lt;br /&gt;
&lt;br /&gt;
===$$Power: Kerry/Alex/MTC===&lt;br /&gt;
*Need new Marine Deep Cycle solution... &lt;br /&gt;
** or migrate to a 12-15v supply.&lt;br /&gt;
*Test UPS for computer.&lt;br /&gt;
**Tested and seems fine.&lt;br /&gt;
&lt;br /&gt;
===Radiometers: Kerry/Alex:===&lt;br /&gt;
*Replace downlooking radiometers w/ calibrated units.&lt;br /&gt;
**Done.&lt;br /&gt;
*Longwave programming.&lt;br /&gt;
**Done.&lt;br /&gt;
*New shadow band appears to be performing well.&lt;br /&gt;
**Scope power alternatives for heater power supply.&lt;br /&gt;
***12-15V power supply on line power?&lt;br /&gt;
**Continue to run manual till we iron out differences in readings.&lt;br /&gt;
**Calibration every 2 years, plan for 2011 session.  Do we need a second for leapfrogging?&lt;br /&gt;
*NIR radiometers: red domes are close to impossible to obtain, we'll probably squeak by another year or two on what we've got but we need to investigate long term solutions.  Alex has done good ground work on this.&lt;br /&gt;
**Alex's notes on net radiometers:&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
It looks like the integrated net radiometers are starting to get popular.  &lt;br /&gt;
Campbell just announced the release of a new one which looks like a really &lt;br /&gt;
slick design and has better specs than the other set we were looking at:  &lt;br /&gt;
http://www.campbellsci.com/cnr4&lt;br /&gt;
&lt;br /&gt;
CNR4-L 26003- Kipp &amp;amp; Zonen 4-Component Net Radiation Sensor $6,400.00&lt;br /&gt;
26120 26120 Net Radiation Sensor Mounting Kit  $145.00&lt;br /&gt;
CNF4-L 26008- Kipp &amp;amp; Zonen Ventilation Unit w/Heater $1,600.00&lt;br /&gt;
&lt;br /&gt;
They've also got something for $4350 they're calling the NR01, manufactured &lt;br /&gt;
by Hukseflux, which appears to be the same instrument as the Dynamax SN01: &lt;br /&gt;
http://www.campbellsci.com/nr01&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===$$Perimeter Poles: Ned/Alex:===&lt;br /&gt;
*Ned to investigate permit/pounder/materials to implement 4&amp;quot;OD, 6' long poles.&lt;br /&gt;
*Scoping plates w/ couplers/poles welded.  2' plate, 4-6' poles w/ 3-4&amp;quot; OD.&lt;br /&gt;
*20100825: planning on galvanized pipe flange mounted to sheet metal or something w/ a 6-10&amp;quot; 2-3&amp;quot; galvanized nipple which we can drop PVC or galvanized pipe into to be removed when the snow is deep enuf to support bamboo.&lt;br /&gt;
&lt;br /&gt;
===$$Paint: MTC/Ned/Alex:===&lt;br /&gt;
*Scraper&lt;br /&gt;
*Brush it on thick and simple.&lt;br /&gt;
&lt;br /&gt;
===$$Snow Pillow:===&lt;br /&gt;
* nothing happening currently but still on the long-term wish-list.  Previous notes reference a &amp;quot;DRUCK 5 PSI&amp;quot;???&lt;br /&gt;
**Relocate snow pillow from platform to side of big lysimeter on cinder blocks, the lysimeter is too fragile to mount the snow pillow on top of it... tho that would be a cool way to design a new snow pillow/ lysimeter combo device.&lt;br /&gt;
&lt;br /&gt;
===$$Precip Guage?===&lt;br /&gt;
*Laser based unit?&lt;br /&gt;
**Bail, too tuff w/ blowing snow and LiDAR will take care of this to some degree.&lt;br /&gt;
&lt;br /&gt;
===$$MMSA chairlift wind integration:===&lt;br /&gt;
*Chair1 working well, additional updates pending Dallas/Davis/Dozier meeting on Sept 19th.&lt;br /&gt;
**Meeting went well, MMSA moving ahead w/ updates.&lt;br /&gt;
&lt;br /&gt;
===Graphs: Alex/Ned/MTC:===&lt;br /&gt;
*RTMC (comes w/ loggernet) implementation of graphs, similar to [http://patrol.mammothmountain.com Patrol].&lt;br /&gt;
&lt;br /&gt;
===Misc===&lt;br /&gt;
*Integrate data from old wiki into new.&lt;br /&gt;
*Polish up web presence.&lt;br /&gt;
*Design and schedule data Q/A procedure.&lt;/div&gt;</summary>
		<author><name>Cues</name></author>
		
	</entry>
</feed>